|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 5/1/2023 Measured TD: 7695 ft. Vertical TD: 7565 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 5/1/2023 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 4/20/2016 | Proposed Top PZ Location: | Sec:25 Twp: 2N 97W | Footage: 1980 FSL 670 FWL | Bottom Hole Location: | Sec:25 Twp: 2N 97W | Footage: 1980 FSL 670 FWL | Proposed Depth/Form: | 7515 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | Unit: | | Unit Number: | | Formation And Spacing: | Code: WFILM , Formation: WILLIAMS FORK- ILES - MANCOS , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: WSMVD , Formation: WASATCH-MESAVERDE , Order: , Unit Acreage: , Drill Unit: | Casing: | String Type: CONDUCTOR, Hole Size: 16 in., Size: 13.375 in., Top: 0 ft., Depth: 250 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 150, Top: 0 ft., Bottom: 250 ft. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1100 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 335, Top: 0 ft., Bottom: 1100 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 7695 ft., Weight: 17 , Citings Type: PLANNED | Cement: | Sacks: 1590, Top: 0 ft., Bottom: 7695 ft. |
| | |
Wellbore Completed | Completion Date: | 1/12/2015 | Spud Date: | 12/29/2014 | Spud Date Is: | ACTUAL | Measured TD: | 7695 ft. | Measured PB depth: | 7650 ft. | True Vertical TD: | 7565 ft. | True Vertical PB depth: | 7530 ft. | Top PZ Location: | Sec:25 Twp: 2N 97W | Footage: 1971 FSL 672 FWL | Bottom Hole Location: | Sec:25 Twp: 2N 97W | Footage: 1971 S 672 W | Log Types: | CBL & Triple Combo (Gamma, Neutron, & Resistivity) | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 60 ft., Weight: 94 , Citings Type: ACTUAL | Cement: | Sacks: 140, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 256 ft., Weight: 54.5 , Citings Type: ACTUAL | Cement: | Sacks: 285, Top: 0 ft., Bottom: 256 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1090 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 450, Top: 0 ft., Bottom: 1090 ft., Determination Method: CBL | Casing: | String Type: 2ND, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 7695 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 1410, Top: 4790 ft., Bottom: 7695 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | WILLIAMS FORK | 3402 ft. | 6126 ft. | N | N | CAMEO | 6126 ft. | 6347 ft. | N | N | ILES | 6532 ft. | 7316 ft. | N | N | COZZETTE | 7316 ft. | 7398 ft. | N | N |
Formation WMFK Formation Classification: GW Status: SI - 5/1/2023 Interval Top: 5064 ft. Interval Bottom: 7434 ft. Completed Information for Formation WILLIAMS FORK | 1st Production Date: | 2/2/2015 | Choke Size: | 0.360 in. | Formation Name: | WILLIAMS FORK | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6250 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/2/2015 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | FLARED | |
Test Type | Measure |
---|
BBLS_H2O | 1748 | BTU_GAS | 952 | CALC_BBLS_H2O | 1748 | CALC_MCF_GAS | 1120 | CASING_PRESS | 1250 | MCF_GAS | 1120 | TUBING_PRESS | 625 |
| Perforation Data: | Interval Top: | 5064 ft. | # Of Holes: | 314 | Interval Bottom: | 7434 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 04/30/2023 |
Low Producing | Y | Production Period 01/2024 - 12/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | Y |
|
|