Planning | Form: (02 ) 400330087 10/26/2012 | Chevron trains all employees in safe work practices, good environmental stewardship, health and wellness isues and to ensure that poper personal protective equipment is available and being used correctly. Chevron has up to date Spill Protection Control and Countermeasure Plans for the Rangely field. |
Construction | Form: (02 ) 400330087 10/26/2012 | No portion of the cutting trench will be used to hold liquids, the trench will be constructed entirely in the cut. |
Drilling/Completion Operations | Form: (02 ) 400330087 10/26/2012 | A closed loop system will be implemented during drilling, using a cuttting "trench", de watering system, centrifuge system. Any skim oil recovered will be trucked to the Chevron Main Water Plant and then pipelined to a oil gathering collection station. |
Storm Water/Erosion Control | Form: (02 ) 400330087 10/26/2012 | A diversion ditch will be constructed along the east and south side of the location to control runoff and erosion. |