Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-11951
Well Classification: OW Status: PR - 2/1/2021
Well Name/No:FEE #163X
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2021
FacilityID:430611LocationID:430614
County:RIO BLANCO #103Location:NENE 33 2N102W 6
Field:RANGELY - #72370Elevation:5267 ft.
Planned Location:422FNL  1102 FELLat/Long: 40.105611 / -108.842800Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.105638 / -108.842796Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/14/2013
End Date: 2/14/2013
Reported: 5/28/2013
Days to report: 103
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/1/2021             Measured TD: 6509 ft.    Vertical TD: 6509 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/1/2021
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:10/25/2014
Prop Depth/Form:6488 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit:RANGELY Unit Number:COC47675X
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 18 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 55 , Citings Type: PLANNED
Cement:Sacks: 90, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2000 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 605, Top: 0 ft., Bottom: 2000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6488 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 720, Top: , Bottom: 6488 ft.

Wellbore Completed
Completion Date:2/5/2013
Spud Date:12/3/2012Spud Date Is:ACTUAL
Measured TD:6509 ft.Measured PB depth:6509 ft.
True Vertical TD:6509 ft.True Vertical PB depth:6509 ft.
Top PZ Location:Sec:33 Twp: 2N 102WFootage: 31 FNL  1068 FELDepth
Bottom Hole Location:Sec:33 Twp: 2N 102WFootage: 31 FNL  1068 FELDepth
Log Types:GAMMA RAY, CBL, NEUTRON
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2002 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 0 ft., Bottom: 2002 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5653 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 737, Top: 2100 ft., Bottom: 5653 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WEBER5628 ft.6509 ft.YN

Formation WEBR                     Formation Classification:  OW                     Status:  PR - 2/1/2021                  Interval Top: 5663 ft.    Interval Bottom: 6509 ft.

 Completed Information for Formation WEBER
1st Production Date:3/18/2013Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/14/2013Treatment End Date:2/14/2013
Treatment Summary:FRACTURE STIMULATION WITH TOTAL 184,660# PROPPANT
Total fluid used in treatment (bbls):2435Max pressure during treatment (psi):2193
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:9
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):290Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):184660Green completions techniques utilized:--
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.875 in.Tubing Setting Depth:5583 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/19/2013Test Method:VESSEL
Hours Tested:24Gas Type:DRY
Gas Disposal:RE-INJECTED
Test TypeMeasure
BBLS_H2O 600
BBLS_OIL 5
CALC_BBLS_H2O 600
CALC_BBLS_OIL 5
CALC_MCF_GAS 263
GRAVITY_OIL 34
MCF_GAS 263
Perforation Data:
Interval Top:5663 ft.# Of Holes:
Interval Bottom:6509 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)5215
Total Gas Produced (MCF)0
GOR
GOR DeterminationBOE
Average BOE per Day14.286
Average MCFE per Day82.856

 Federal Financial Assurance  i 

 Tribal Well  i No