COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02 )
400311470
8/6/2012
1)COMPLIANCE WITH THE MOST CURRENT REVISION OF THE NORTHWEST COLORADO NOTIFICATION POLICY IS REQUIRED. 2)THE PROPOSED SURFACE CASING IS MORE THAN 50' BELOW THE DEPTH OF THE DEEPEST WATER WELL WITHIN 1MILE OF THE SURFACE LOCATION WHEN CORRECTED FOR ELEVATION DIFFERENCES. THE DEEPEST WATER WELL WITHIN 1 MILE IS 000 FEET DEEP.
EngineerForm: (04 )
401189019
3/22/2018
This approval is good for one year and a new application must be made before January 19, 2018(1 year from prior application). Updates for the planned utilization of the well should be included with the application. A Form 5A is required to report all plugs currently downhole which isolate the perforated interval. The Form 7 reporting must reflect the well status dates reported on the TA request.
EngineerForm: (04 )
401521475
3/22/2018
This approval is good for one year and a new application must be made before January 22, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application. A Form 5A is required to report all plugs currently downhole which isolate the perforated interval. The Form 7 reporting must reflect the well status dates reported on the TA request.
EngineerForm: (04 )
401735781
8/17/2018
This approval is good for one year and a new application must be made before January 22, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application. The Form 7 reporting must reflect the well status dates reported on the TA request.
EngineerForm: (04 )
401873182
4/22/2019
This approval is good for one year and a new application must be made before January 22, 2020(1 year from prior application). Updates for the planned utilization of the well should be included with the application. The Form 7 reporting must reflect the well status dates reported on the TA request.
EngineerForm: (04 )
402269626
3/30/2020
1) This approval is good for one year and a new application must be made before 1/09/2021 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. 3) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
ConstructionForm: (02 )
400311470
8/30/2012
The cuttings pit will be constructed to the BLM Gold Book standards. No portion of the drilling pit will be constructed on any fill material. The entire base of the pit will be in the cut.
Material Handling and Spill PreventionForm: (02 )
400311470
8/30/2012
Chevron will ensure 110 percent of secondary containment for any volume of fluids contained at the well site during the drilling and completion operations, including construction of berms or diversion dikes.
Drilling/Completion OperationsForm: (02 )
400311470
8/30/2012
A closed loop system will be implemented during drilling, using a cuttings catch pit, dewatering system, centrifuge system.