Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 2/17/2020 | Treatment End Date: | 2/18/2020 |
Treatment Summary: | WELL WAS CLEANED OUT TO PBTD, RE-PERFORATED AND ADD NEW PERFORATIONS, ACIDIZED WITH 6000 GALLONS (142.8 BBLS) OF HCL 15% WITH 6% CITRIC ACID AND 90 BBLS OF WATER. RETURN TO INJECTION PENDING APPROVAL OF MIT. |
Total fluid used in treatment (bbls): | 232 | Max pressure during treatment (psi): | 2200 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 142 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 90 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 5/29/2015 | Treatment End Date: | 5/29/2015 |
Treatment Summary: | Acid stimulation - pumped 4000 gallons 15% HCl |
Total fluid used in treatment (bbls): | 135 | Max pressure during treatment (psi): | 4500 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 40 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 5/2/2014 | Treatment End Date: | 5/2/2014 |
Treatment Summary: | 1500 GALLONS 15% HCL AT 3 BPM |
Total fluid used in treatment (bbls): | 151 | Max pressure during treatment (psi): | 2150 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 96 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 55 | Disposition method For flowback: | RECYCLE |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: PIPELINE |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 1/24/2013 | Treatment End Date: | 1/24/2013 |
Treatment Summary: | 1500 GALLONS 15% HCL AT 0.5 BPM @ 1500 PSI TO BREAKDOWN PERFS |
Total fluid used in treatment (bbls): | 63 | Max pressure during treatment (psi): | 1500 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 35 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | 240 | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 28 | Disposition method For flowback: | RECYCLE |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: PIPELINE |