| Engineer | Form: (04) 404219320 06/09/2025 | 1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations
2) Operator shall notify ECMC Engineering staff of changes and/or additional repair methods to the approved repair procedure.
3) Complete a Form 21 MIT to verify repairs for injection wells. MIT is required to be approved prior to returning well to injection
4) For applicable operations, submit a Form 5 or 5A (updated packer and tubing depths) within 30 days of the work with job related documents including a minimum of one of the following attachments: operations summary, cement job summary and/or wireline summary. Additionally, include CBL’s and any additional logs run.
|
| OGLA | Form: (04) 404219320 06/18/2025 | Operator committed to the following Best Management Practices:
1. Wildlife – Minimization: To minimize the potential for wildlife related traffic accidents, TEP has implemented speed restrictions for all lease roads and requires that all TEP employees and contractors adhere to these posted speed restrictions.
2. Wildlife – Minimization: TEP will make best efforts to minimize operations at these location during winter months by conducting operations, when possible, between 9:00am to 4:00pm when wildlife activity minimal.
3. Wildlife – Minimization: TEP will minimize vehicle numbers and traffic by carpooling to the site whenever possible. |