Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-11000
Well Classification: DSPW Status: IJ - 9/1/2025
Well Name/No:B-19N #SWD #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:IJStatus Date9/1/2025
FacilityID:290100LocationID:311852
County:RIO BLANCO #103Location:SESW 19 2S97W 6
Field:SULPHUR CREEK - #80090Elevation:6301 ft.
Basin:PICEANCE BASIN  
Planned Location:1148FSL  1437 FWLLat/Long: 39.857700 / -108.329050Lat/Long Source: Field Measured
As Drilled Location:1027 FSL  1717 FWLLat/Long: 39.857368 / -108.328057Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: DSPW             Status: IJ - 9/1/2025             Measured TD: 5000 ft.

 Wellbore Data for Original WellboreWellbore Classification: DSPW        IJ - 9/1/2025
Wellbore Permit
Permit #:20071155 Expiration Date:4/9/2008
Proposed Top PZ Location:Sec: Twp: Footage: 1148 FSL  1438 FWL
Bottom Hole Location:Sec:19 Twp: 2S 97W Footage: 1027 FSL  1717 FWL
Proposed Depth/Form:5000 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:1/19/2008
Spud Date:12/20/2007Spud Date Is:ACTUAL
Measured TD:5000 ft.Measured PB depth:4963 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1148 FSL  1438 FWL
Bottom Hole Location:Sec:19 Twp: 2S 97WFootage: 1027 FSL  1717 FWL
Log Types:AISF, HOLE VOLUME, MICRO RESISTIVITY, CPD/CDN
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 9.625 in., Top: 0 ft., Depth: 80 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 80 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 2168 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 999, Top: 0 ft., Bottom: 2168 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 4993 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 602, Top: 1862 ft., Bottom: 4993 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH B2681 ft.NN
WASATCH D3065 ft.NN
WASATCH F3621 ft.NN
WASATCH G3795 ft.NN
FORT UNION4571 ft.NN

Formation FTUN                     Formation Classification:  DSPW                     Status:  CM - 7/18/2011                 Interval Top: 4839 ft.    Interval Bottom: 4896 ft.

 Completed Information for Formation FORT UNION
1st Production Date:N/AChoke Size: 
Formation Name:FORT UNIONCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:11/5/2008
Treatment Summary:PERF UPPER DT UNION SAND FROM 4883 TO 4896' 13'-26 HOLES. 4850-4857' 7'-14 HOLES & 4797-4839'; 42'-84 HOLES, ALL W/ 3 1/8" GUNS, 1JSPF, 32 GRAMS. 2 3/8" TUBING SET @4126' ON 10/26/2008, PACKER DEPTH 4126'. CASING PSI 2000, TUBING PSI 206
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTUN.
Perforation Data:
Interval Top:4839 ft.# Of Holes:124
Interval Bottom:4896 ft.Hole Size:

Formation FT-WS                   Formation Classification:  DSPW                   Status:  IJ - 9/1/2025                  Interval Top: 4330 ft.    Interval Bottom: 4896 ft.

 Completed Information for Formation FORT UNION-WASATCH
1st Production Date:N/AChoke Size: 
Formation Name:FORT UNION-WASATCHCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FT-WS.
Perforation Data:
Interval Top:4330 ft.# Of Holes:212
Interval Bottom:4896 ft.Hole Size:0.38 in.

Formation WSTCG                   Formation Classification:  DSPW                   Status:  CM - 7/18/2011                 Interval Top: 4330 ft.    Interval Bottom: 4470 ft.

 Completed Information for Formation WASATCH G
1st Production Date:N/AChoke Size: 
Formation Name:WASATCH GCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:11/5/2008
Treatment Summary:PERFORATE FROM 4452' TO 4470', 4330'-4356' W/ 3 1/8" GUNS, 2 JSPF, 32 GRAM CHARGES. 2 3/8" tubing set 4126' on 10/29/2008, packer depth 4126', Casing PSI 2000, tubing PSI 206
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WSTCG.
Perforation Data:
Interval Top:4330 ft.# Of Holes:88
Interval Bottom:4470 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No