Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-103-10755M.B. LARSON B
3 AX
SCOUT ENERGY MANAGEMENT LLC
10779
IJ
6/1/2024
RANGELY
72370
RIO BLANCO  103
NWNE 22 2N103W 6
316540View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
UICForm: (04 )
403783531
5/15/2024
All injection Well mechanical integrity tests will be witnessed by the Director.
UICForm: (04 )
403783531
5/15/2024
The mechanical integrity test will be performed with all isolating devices set 100 feet or less above the open hole zone.
UICForm: (04 )
403783531
5/15/2024
1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations. 2) The placed cement shall be verified with a CBL and documented with a Form 5 within 30 days of repair operations. 3) Pressure test to be submitted on Form 21 within 30 days of the pressure test.
EngineerForm: (04 )
403783531
5/16/2024
1) For applicable operations , report work completed with a Form 4 Sundry REPORT OF WORK DONE - Repair Well noting final pressure test results and include any operational or job summaries. If the wellbore geometry changes or there is not an updated WBD in the well file submit an updated WBD. 2) For applicable operations, submit a Form 5A or 5 within 30 days of the work with job related documents including a minimum of one of the following attachments: operations summary, cement job summary and/or wireline summary. Additionally, include CBL’s and any additional logs run. 3) Complete a Form 21 MIT to verify repairs for injection wells
 
COGIS - Best Management Practice Results
No records to display.