| Formation Treatment |
| Treatment Type: | |
| Treatment Date: | 7/31/2025 | Treatment End Date: | N/A |
| Treatment Summary: | Well work performed on UIC repair, POOH w/ both pkrs, RIH w/ CO BHA, tst csg, RBIH w/ new inj BHA and FL tbg, RDMO. Return to injection pending an approved Form 21 MIT.
|
| Total fluid used in treatment (bbls): | 1115 | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 1015 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 855 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 10/7/2022 | Treatment End Date: | 10/7/2022 |
| Treatment Summary: | Pumped 4000 gallons (95.2 bbls) 15% HCL with mutual solvent and 35 bbls water. |
| Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 2400 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 4/8/2022 | Treatment End Date: | 4/8/2022 |
| Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/ 6% CITRIC ACID AND 35 BBLS WATER |
| Total fluid used in treatment (bbls): | 140 | Max pressure during treatment (psi): | 2400 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 3/4/2021 | Treatment End Date: | 3/4/2021 |
| Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/ 6% CITRIC ACID AND 48 BBLS WATER |
| Total fluid used in treatment (bbls): | 143 | Max pressure during treatment (psi): | 2300 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 48 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 11/6/2019 | Treatment End Date: | 11/6/2019 |
| Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL WITH SOLVENT, 38 BBLS WATER. |
| Total fluid used in treatment (bbls): | 85 | Max pressure during treatment (psi): | 2000 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 38 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 7/20/2017 | Treatment End Date: | 7/20/2017 |
| Treatment Summary: | PUMPED 2000 GALLONS 15% HCL WITH 110 GALLONS SOLVENT, USED 130 BBLS FRESH WATER |
| Total fluid used in treatment (bbls): | 180 | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 130 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Date: | 10/28/2006 |
| Treatment Summary: | |