Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-103-10197PICEANCE CREEK UNIT
T64X-8G
QB ENERGY OPERATING LLC
10844
PR
3/1/2017
PICEANCE CREEK
68800
RIO BLANCO  103
SWNE 8 2S96W 6
316302View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
403223998
11/23/2022
1) Operator shall comply with COGCC Rule 419. Bradenhead Monitoring, Testing, and Reporting and Rule 420. Form 17, Bradenhead Test Report 2) At least once a year shut in bradenhead for 7 days or until the pressure reaches the bradenhead threshold and perform a bradenhead test. Report results on a Form 17, as specified in Rule 420 or other Director approved submittal method. 3) Within 30 days of completing the work, submit a Form 4 Subsequent Report - Bradenhead Plan -Include diagnostic information on causal factors for intermediate casing pressure. 4) Submit a current WBD on a Form 4 Sundry “COMPLIANCE with CONDITION OF APPROVAL (COA)” by 02/31/23 5) Complete installation of BH monitoring system by 3/31/2023
EngineerForm: (04)
404435037
02/19/2026
Well to be plugged or repaired within 6 months of identifying integrity issue
EngineerForm: (04)
404608344
04/30/2026
1. Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare. 2. Well to be plugged or repaired within 6 months of identifying integrity issue- 08/05/2024. Pressure is to be managed and mitigated until repair or plugging is complete. . 3. Shut in bradenhead pressure shall not exceed threshold pressure. 4. Isolate casing leaks during P&A operations
 
COGIS - Best Management Practice Results
No records to display.