Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-10197
Well Classification: GW Status: PR - 3/1/2017
Well Name/No:PICEANCE CREEK UNIT #T64X-8G
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COD 052122
Facility Status:PRStatus Date3/1/2017
FacilityID:261166LocationID:316302
County:RIO BLANCO #103Location:SWNE 8 2S96W 6
Field:PICEANCE CREEK - #68800Elevation:7513 ft.
Basin:PICEANCE BASIN  
Planned Location:2483FNL  1735 FELLat/Long: 39.891492 / -108.189173Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.891190 / -108.189060Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/1/2017             Measured TD: 13925 ft.    Vertical TD: 13905 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/1/2017
Wellbore Permit
Permit #:20042660 Expiration Date:11/22/2005
Proposed Depth/Form:16500 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:PICEANCE CREEK Unit Number:COC 47666X
Formation And Spacing:Code: MVRD , Formation: MESAVERDE , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: 1ST LINER, Hole Size: 8.75 in., Size: 5.5 in., Top: , Depth: 16500 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 3110, Top: 2500 ft., Bottom: 16500 ft.

Wellbore Completed
Completion Date:7/29/2005
Spud Date:6/22/2005Spud Date Is:ACTUAL
Measured TD:13925 ft.Measured PB depth:13834 ft.
True Vertical TD:13905 ft.True Vertical PB depth:13814 ft.
Log Types:PEX-SAIT,GPIT,DSLT,GR,PEX-SLIM,AIT,DEN,NEW,S,PEX BHC,GPIT,CBL,AIT/GR
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 130 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 86, Top: 0 ft., Bottom: 130 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 10.75 in., Top: 0 ft., Depth: 2793 ft., Weight: 40.5 , Citings Type: ACTUAL
Cement:Sacks: 785, Top: 0 ft., Bottom: 2793 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: , Size: 5.5 in., Top: 2793 ft., Depth: 4312 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1560, Top: 2793 ft., Bottom: 4312 ft., Determination Method:
Casing:String Type: 2ND, Hole Size: 9.875 in., Size: 7.875 in., Top: 900 ft., Depth: 7200 ft., Weight: 9020 , Citings Type: ACTUAL
Cement:Sacks: 9020, Top: , Bottom: , Determination Method:
Casing:String Type: 3RD, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 13925 ft., Weight: 15.1 , Citings Type: ACTUAL
Cement:Sacks: 748, Top: 4400 ft., Bottom: 13925 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
WASATCH G6161 ft.8122 ft.NN
OHIO CREEK8122 ft.8305 ft.NN
WILLIAMS FORK - CAMEO8305 ft.12602 ft.NN
ROLLINS12602 ft.12805 ft.NN
COZZETTE12805 ft.13159 ft.NN
CORCORAN13159 ft.13925 ft.NN

Formation CRCRN                   Formation Classification:  GW                   Status:  PR - 3/1/2017                  Interval Top: 13398 ft.    Interval Bottom: 13712 ft.

 Completed Information for Formation CORCORAN
1st Production Date:N/AChoke Size:0.531 in.
Formation Name:CORCORANCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/27/2005
Treatment Summary:FRAC'D W/114,507# 40/70 AFB PROPPANT.
Tubing Size:2.375 in.Tubing Setting Depth:12451 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/11/2005Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 7
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 1626
CASING_PRESS 1944
Perforation Data:
Interval Top:13398 ft.# Of Holes:56
Interval Bottom:13712 ft.Hole Size:0.32 in.

Formation COZZ                     Formation Classification:  GW                     Status:  PR - 3/1/2017                  Interval Top: 12810 ft.    Interval Bottom: 13074 ft.

 Completed Information for Formation COZZETTE
1st Production Date:N/AChoke Size:0.531 in.
Formation Name:COZZETTECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/27/2005
Treatment Summary:FRAC'D W/87,700# 40/70 AFB PROPPANT. SET FRAC PLUG @ 12,600
Tubing Size:2.375 in.Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/11/2005Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 3
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 752
CASING_PRESS 1944
Perforation Data:
Interval Top:12810 ft.# Of Holes:24
Interval Bottom:13074 ft.Hole Size:0.32 in.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/1/2017                  Interval Top: 9184 ft.    Interval Bottom: 12576 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.531 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/27/2005
Treatment Summary:FRAC'D W/ 1,432,470# PROPPANT (1,004,021# 30/50 WHT & 428,229# 30/70 BRADY). SET FRAC PLUGS @ 12,165', 11,450', 11,146', 11,058', 10,536', 10,228', 9,572' & 9,270'.
Tubing Size:2.375 in.Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/11/2005Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 42
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 9124
CASING_PRESS 1944
Perforation Data:
Interval Top:9184 ft.# Of Holes:604
Interval Bottom:12576 ft.Hole Size:0.32 in.

Formation OHCRK                   Formation Classification:  GW                   Status:  PR - 3/1/2017                  Interval Top: 8201 ft.    Interval Bottom: 8280 ft.

 Completed Information for Formation OHIO CREEK
1st Production Date:N/AChoke Size:0.531 in.
Formation Name:OHIO CREEKCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/2/2005
Treatment Summary:FRAC'D W/153,405# 30/70 BRADY PROPPANT. DO ALL FRAC PLUGS.
Tubing Size:2.375 in.Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/11/2005Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 2
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 389
CASING_PRESS 1944
Perforation Data:
Interval Top:8201 ft.# Of Holes:24
Interval Bottom:8280 ft.Hole Size:0.32 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)194
Total Gas Produced (MCF)40262
GOR207536
GOR DeterminationMCFE
Average BOE per Day19.589
Average MCFE per Day113.613

 Federal Financial Assurance  i Y

 Tribal Well  i No