Engineer | Form: (04 ) 402782132 9/30/2021 | 1) Report work completed with a Form 4 Sundry REPORT OF WORK DONE - Repair Well noting final pressure test results.
2) If wellbore geometry changes or cement work is executed, submit information on a Form 5.
3) If a casing leak is identified, contact area engineer with repair plans.
4) Complete a Form 21 MIT to verify repairs for injection wells.
|