Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 10/12/2022 | Treatment End Date: | 10/12/2022 |
Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/MUTUAL SOLVENT AND 35 BBLS WATER |
Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 2400 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 1/24/2022 | Treatment End Date: | 1/24/2022 |
Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/MUTUAL SOLVENT AND 100 BBLS WATER
|
Total fluid used in treatment (bbls): | 195 | Max pressure during treatment (psi): | 2400 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 100 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | |
Treatment Date: | 12/30/2021 | Treatment End Date: | N/A |
Treatment Summary: | The workover consisted of pulling the injection tubing, and both the top & bottom packers, running new packers & tubing, and adding a TM-40 spool & hanger. |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 12/4/2017 | Treatment End Date: | 12/5/2017 |
Treatment Summary: | PUMPED 4000 GALLONS 15% HCL AND 240 BBLS WATER |
Total fluid used in treatment (bbls): | 335 | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 240 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 3/30/2011 |
Treatment Summary: | ACID STIMULATION 3/30/2011 PUMPED 3000 GALLONS HCL THROUGH END OF COILED TUBING 5930', AT STARTING PRESSURE OF 3/4" BPM @ 500 PSI. |
Formation Treatment |
Treatment Date: | 3/13/2008 |
Treatment Summary: | FISH 5 PACKERS AND 4 MANDRELS, CLEAN OUT, RE-PERF AND ADD PERFORATIONS (SEE ATTACHED PERFORATION DETAIL). |