WELL05-103-08699UNION PACIFIC
120 X 21
SCOUT ENERGY MANAGEMENT LLC
10779
PR
7/1/2022
RANGELY
72370
RIO BLANCO  103
SWNE 21 2N102W 6
315555View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04 )
401513610
3/13/2018
This approval is good for one year and a new application must be made before January 15, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application. A Form 5A is required to report all plugs currently downhole which isolate the perforated interval. Form 7 reporting must reflect the well status dates reported on the TA request.
EngineerForm: (04 )
401185916
3/13/2018
This approval is good for one year and a new application must be made before January 16, 2018(1 year from prior application). Updates for the planned utilization of the well should be included with the application. A Form 5A is required to report all plugs currently downhole which isolate the perforated interval. Form 7 reporting must reflect the well status dates reported on the TA request.
EngineerForm: (04 )
401700791
10/2/2018
This approval is good for one year and a new application must be made before January 15, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
EngineerForm: (04 )
401870380
4/16/2019
This approval is good for one year and a new application must be made before January 15, 2020(1 year from prior application). Updates for the planned utilization of the well should be included with the application. A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
EngineerForm: (04 )
402269679
3/31/2020
1) This approval is good for one year and a new application must be made before 1/09/2021 (1 year from prior application). Updates for the planned utilization of the well should be included with the application. 2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. 3) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
 
COGIS - Best Management Practice Results