Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-08699
Well Classification: OW Status: PR - 7/1/2022
Well Name/No:UNION PACIFIC #120 X 21
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:PRStatus Date7/1/2022
FacilityID:231030LocationID:315555
County:RIO BLANCO #103Location:SWNE 21 2N102W 6
Field:RANGELY - #72370Elevation:5356 ft.
Planned Location:2639FNL  1325 FELLat/Long: 40.128575 / -108.843455Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.128550 / -108.843590Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/1/2022             Measured TD: 6612 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/1/2022
Wellbore Permit
Permit #:10001 Expiration Date:7/18/1981
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:8/19/1981
Spud Date:5/3/1981Spud Date Is:ACTUAL
Measured TD:6612 ft.Measured PB depth:6580 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIL, RFT, FDL-GG
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2982 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 675, Top: 0 ft., Bottom: 2982 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6612 ft., Weight: 23 & 26 , Citings Type: ACTUAL
Cement:Sacks: 970, Top: , Bottom: 6612 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
DAKOTA3598 ft.
MORRISON3726 ft.
ENTRADA4511 ft.
NAVAJO4677 ft.
CHINLE5280 ft.
WEBER6172 ft.

Formation WEBR                     Formation Classification:  OW                     Status:  PR - 7/1/2022                  Interval Top: 6159 ft.    Interval Bottom: 6559 ft.

 Completed Information for Formation WEBER
1st Production Date:8/19/1981Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:12/9/2019Treatment End Date:12/9/2019
Treatment Summary:PUMPED 3000 GALLONS (71.4 BBLS) 15% HCL WITH 1% PAO72 PARRAFIN DISPERSANT.
Total fluid used in treatment (bbls):71Max pressure during treatment (psi):1150
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):71Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:5/9/2017Treatment End Date:N/A
Treatment Summary:TUBING PLUG WAS SET AT 5783' ON 7/22/2005
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:8/19/1981
Treatment Summary:B/D using source water, acid & RCN balls. Fraced in 6 stages using 76,500 gals. Apollo 50. 18,000 lbs 100 mesh, 43,500 lbs 20/40 sand & 22,500 lbs. 10/20 sand. (Completion Report #581560)
Tubing Size:2.875 in.Tubing Setting Depth:5804 ft.
Tubing Packer Depth:5767 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:6159 ft.# Of Holes:69
Interval Bottom:6559 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)1105
Total Gas Produced (MCF)0
GOR
GOR DeterminationBOE
Average BOE per Day3.020
Average MCFE per Day17.521

 Federal Financial Assurance  i 

 Tribal Well  i No