UIC | Form: (04 ) 401821413 11/5/2018 | Contact COGCC with update on progress by November 23, 2018. Email or telephone call acceptable. |
Engineer | Form: (04 ) 402621764 4/19/2021 | 1) This sundry to conduct bradenhead diagnostic evaluations is valid until 3/8/2022
2) For Wells that have sustained casing pressure above the action threshold as determined through diagnostic testing and evaluation, the Operator will provide a PMP with the Form 4, including a description of the Operator’s findings from the previous year, number of times the well was blown down, a current WBD and future plans for more frequent monitoring or testing, pressure mitigation, or remedial well work by 3/8/2022
3) Bradenhead bleed off is required to be in compliance with COGCC and CDPHE regulations. |
Engineer | Form: (04 ) 402971370 3/24/2022 | 1) Operator shall comply with COGCC Rule 419. Bradenhead Monitoring, Testing, and Reporting and Rule 420. Form 17, Bradenhead Test Report
2) At least once a year shut in bradenhead for 7 days or until the pressure reaches the bradenhead threshold and perform a bradenhead test. Report results on a Form 17, as specified in Rule 420 or other Director approved submittal method.
|