Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-103-07270M B LARSON
C12 X 25
SCOUT ENERGY MANAGEMENT LLC
10779
PR
1/21/2025
RANGELY
72370
RIO BLANCO  103
SWNW 25 2N102W 6
314799View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
403983117
11/06/2024
1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations. 2) Operator shall notify ECMC engineering staff of casing leak location and to determine cementing plan. Primary contact is Aaron Katz at 970-765-6300. Alternate ECMC contact is Curtis Haverkamp at 720-786-5560. 3) Prior to placing cement above the surface casing shoe: verify that all fluid (liquid and gas) migration has been eliminated. If evidence of fluid migration or pressure remains, contact ECMC Engineer for an update to plugging orders. 4) The placed cement shall be verified with a CBL and documented with a Form 5 within 30 days of repair operations. 5) Verify casing repair with a pressure test and document results on Form 5
EngineerForm: (04)
403983117
11/06/2024
1) Submit a form 5A to report completions, production and tubing details missing from ECMC database
EngineerForm: (04)
404056651
01/20/2025
For applicable operations, submit a Form 5 or 5A (updated packer and tubing depths) within 30 days of the work with job related documents including a minimum of one of the following attachments: operations summary, cement job summary and/or wireline summary. Additionally, include CBL’s and any additional logs run.
 
COGIS - Best Management Practice Results
No records to display.