|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 1/21/2025 Measured TD: | Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 1/21/2025 | | Wellbore Permit | | | Permit #: | 10001 | Expiration Date: | 7/4/1970 | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Measured TD: | | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Casing: | String Type: SURF, Hole Size: 15 in., Size: 10.75 in., Top: 0 ft., Depth: 750 ft., Weight: 40.5 , Citings Type: ACTUAL | | Cement: | Sacks: 525, Top: 0 ft., Bottom: 750 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 9 in., Size: 7 in., Top: 0 ft., Depth: 6553 ft., Weight: 23 , Citings Type: ACTUAL | | Cement: | Sacks: 850, Top: , Bottom: 6553 ft., Determination Method: CALC |
Formation WEBR Formation Classification: OW Status: PR - 1/21/2025 Interval Top: 6194 ft. Interval Bottom: 6528 ft.| Completed Information for Formation WEBER | | 1st Production Date: | 4/19/1970 | Choke Size: | | | Formation Name: | WEBER | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 8/4/2025 | Treatment End Date: | N/A | | Treatment Summary: | Per Document # 404056651 COA to submit form 5A.
1/25 - Casing test, POOH w tbg, PU plug and packer and tested csg, passed pressure test, run production equipment and RWTP. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6121 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WEBR. |
| | Perforation Data: | | Interval Top: | 6194 ft. | # Of Holes: | 66 | | Interval Bottom: | 6528 ft. | Hole Size: | 0.5 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 1330 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | BOE |
| Average BOE per Day | 3.886 |
| Average MCFE per Day | 22.543 |
| Federal Financial Assurance | i | Y |
|
|