Environmental | Form: (04 ) 402479808 11/2/2020 | Based on review of the information provided, it appears that no further action is necessary at this time and COGCC approves the closure request. Should conditions at the site indicate contaminant concentrations in soils exceeding COGCC standards, or, if groundwater is found to be significantly impacted, further investigation and/or remediation activities may be required at the site. |
Engineer | Form: (04 ) 403344311 3/13/2023 | 1) Submit a Form 5A or 5 within 30 days of the work with job related documents including a minimum of one of the following attachments: operations summary, cement job summary and/or wireline summary. Additionally, include CBL’s and any additional logs run.