| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 9/24/2025 | Treatment End Date: | 9/24/2025 |
| Treatment Summary: | PUMPED 2000 GALLONS (45.6 BBLS) 15% HCL w/SOLVENT AND 35 BBLS PRODUCED WATER
NOTE: 100 % PRODUCED WATER USED PER NEW RULES |
| Total fluid used in treatment (bbls): | 82 | Max pressure during treatment (psi): | 2500 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 11/13/2024 | Treatment End Date: | 11/13/2024 |
| Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS ) 15% HCL W/SOLVENT AND 33 BBLS FRESH WATER |
| Total fluid used in treatment (bbls): | 84 | Max pressure during treatment (psi): | 1726 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 33 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 2/1/2023 | Treatment End Date: | 2/1/2023 |
| Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBL.) 15% HCL W/ MUTUAL SOLVENT AND 25 BBL. FRESH WATER. |
| Total fluid used in treatment (bbls): | 73 | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 25 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 10/1/2020 | Treatment End Date: | 10/1/2020 |
| Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL/6%CITRIC ACID AND 2.8 BBLS WLC-603 INHIBITOR, 50 BBLS FRESH WATER |
| Total fluid used in treatment (bbls): | 145 | Max pressure during treatment (psi): | 1600 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 50 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 8/15/2015 | Treatment End Date: | 8/15/2015 |
| Treatment Summary: | Pumped 4000 gallons 15% HCl with 165 gallons Musol solvent |
| Total fluid used in treatment (bbls): | 299 | Max pressure during treatment (psi): | 600 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 200 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Date: | 4/13/2011 |
| Treatment Summary: | ACID STIMULATION 4/13/2011 PUMPED 4000 GALLONS 20% HCL THROUGH TUBING AT 6305' |
| Formation Treatment |
| Treatment Date: | 5/1/2009 |
| Treatment Summary: | ACIDIZE FORMATION WITH 4000 GALLONS HEATED 20% HCI, EOT @ 6549' |