Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 2/1/2023 | Treatment End Date: | 2/1/2023 |
Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBL.) 15% HCL W/ MUTUAL SOLVENT AND 25 BBL. FRESH WATER. |
Total fluid used in treatment (bbls): | 73 | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 25 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 10/1/2020 | Treatment End Date: | 10/1/2020 |
Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL/6%CITRIC ACID AND 2.8 BBLS WLC-603 INHIBITOR, 50 BBLS FRESH WATER |
Total fluid used in treatment (bbls): | 145 | Max pressure during treatment (psi): | 1600 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 50 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 8/15/2015 | Treatment End Date: | 8/15/2015 |
Treatment Summary: | Pumped 4000 gallons 15% HCl with 165 gallons Musol solvent |
Total fluid used in treatment (bbls): | 299 | Max pressure during treatment (psi): | 600 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 200 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 4/13/2011 |
Treatment Summary: | ACID STIMULATION 4/13/2011 PUMPED 4000 GALLONS 20% HCL THROUGH TUBING AT 6305' |
Formation Treatment |
Treatment Date: | 5/1/2009 |
Treatment Summary: | ACIDIZE FORMATION WITH 4000 GALLONS HEATED 20% HCI, EOT @ 6549' |