Engineer | Form: (04 ) 403956190 10/16/2024 | 1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations.
2) For applicable operations , report work completed with a Form 4 Sundry REPORT OF WORK DONE - Repair Well noting final pressure test results and include any operational or job summaries. If the wellbore geometry changes or there is not an updated WBD in the well file submit an updated WBD.
3) For applicable operations, submit a Form 5 or 5A (updated packer and tubing depths) within 30 days of the work with job related documents including a minimum of one of the following attachments: operations summary, cement job summary and/or wireline summary. Additionally, include CBL’s and any additional logs run.
4) Complete a Form 21 MIT to verify repairs for injection wells
|