| Formation Treatment |
| Treatment Type: | |
| Treatment Date: | 9/2/2025 | Treatment End Date: | N/A |
| Treatment Summary: | 1/25 HIT repair, LD FL tbg and top pkr, upgrade wellhead, run new top pkr and FL tbg, chart test casing. Return to service pending an approved Form 21. |
| Total fluid used in treatment (bbls): | 639 | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 630 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 630 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 5/13/2024 | Treatment End Date: | 5/13/2024 |
| Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/SOLVENT AND 45 BBLS FRESH WATER |
| Total fluid used in treatment (bbls): | 92 | Max pressure during treatment (psi): | 1680 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 45 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 9/7/2023 | Treatment End Date: | 9/7/2023 |
| Treatment Summary: | Pumped 47.6 bbls 15% HCL w/solvent and 52 bbls fresh water |
| Total fluid used in treatment (bbls): | 99 | Max pressure during treatment (psi): | 2440 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 52 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 2/14/2019 | Treatment End Date: | 2/14/2019 |
| Treatment Summary: | PUMPED 2000 GALLONS 15% HCL WITH 110 GALLONS SOLVENT, 110 BBLS FRESH WATER |
| Total fluid used in treatment (bbls): | 158 | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 110 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 7/1/2016 | Treatment End Date: | 7/1/2016 |
| Treatment Summary: | Pumped 2000 gallons 15% HCl, 2.6 bbls mutual solvent and 175 bbls fresh water |
| Total fluid used in treatment (bbls): | 225 | Max pressure during treatment (psi): | 2430 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 175 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |