Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-06122
Well Classification: ERIW Status: IJ - 1/21/2025
Well Name/No:UNION PACIFIC #55-17
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date1/21/2025
FacilityID:229044LocationID:314557
County:RIO BLANCO #103Location:SESE 17 2N102W 6
Field:RANGELY - #72370Elevation:5383 ft.
Basin:PICEANCE BASIN  
Planned Location:663FSL  661 FELLat/Long: 40.137635 / -108.860186Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.137618 / -108.860097Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: IJ - 1/21/2025             Measured TD: 6655 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        IJ - 1/21/2025
Wellbore Permit
Permit #:100001 Expiration Date:2/24/2000
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:2/1/1948
Spud Date:11/26/1947Spud Date Is:ACTUAL
Measured TD:6655 ft.Measured PB depth:6545 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CEMENT BOND LOG RUN 9/26/2011
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 10.75 in., Top: 0 ft., Depth: 512 ft., Weight: 33 , Citings Type: ACTUAL
Cement:Sacks: 235, Top: 0 ft., Bottom: 512 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6327 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 0 ft., Bottom: 6327 ft., Determination Method: CALC
Casing:String Type: OPEN HOLE, Hole Size: 6.25 in., Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 6327 ft., Bottom: 6545 ft., Determination Method:
Additional Cement:String Type: OPEN HOLE , Top: 6545 ft., Depth: 6665 ft., Bottom: 6665 ft., Sacks: 24, Method:
FormationInterval TopLog BottomCoredDSTs
ENTRADA4635 ft.
CARMEL4763 ft.
NAVAJO4817 ft.
CHINLE5419 ft.
WEBER6314 ft.6655 ft.NN

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 1/21/2025                 Interval Top: 6327 ft.    Interval Bottom: 6650 ft.

 Completed Information for Formation WEBER
1st Production Date:1/1/1968Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:9/2/2025Treatment End Date:N/A
Treatment Summary:1/25 HIT repair, LD FL tbg and top pkr, upgrade wellhead, run new top pkr and FL tbg, chart test casing. Return to service pending an approved Form 21.
Total fluid used in treatment (bbls):639Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):630Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):630Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:5/13/2024Treatment End Date:5/13/2024
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/SOLVENT AND 45 BBLS FRESH WATER
Total fluid used in treatment (bbls):92Max pressure during treatment (psi):1680
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):45Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:9/7/2023Treatment End Date:9/7/2023
Treatment Summary:Pumped 47.6 bbls 15% HCL w/solvent and 52 bbls fresh water
Total fluid used in treatment (bbls):99Max pressure during treatment (psi):2440
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):52Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:2/14/2019Treatment End Date:2/14/2019
Treatment Summary:PUMPED 2000 GALLONS 15% HCL WITH 110 GALLONS SOLVENT, 110 BBLS FRESH WATER
Total fluid used in treatment (bbls):158Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):110Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:7/1/2016Treatment End Date:7/1/2016
Treatment Summary:Pumped 2000 gallons 15% HCl, 2.6 bbls mutual solvent and 175 bbls fresh water
Total fluid used in treatment (bbls):225Max pressure during treatment (psi):2430
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):175Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:6390 ft.
Tubing Packer Depth:6221 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:6327 ft.# Of Holes:
Interval Bottom:6650 ft.Hole Size:
Primary Well Designation:
Defined Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (UIC)YDefined Inactive
04/30/2023
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No