| Engineer | Form: (02) 400301687 11/08/2012 | 1) Provide remedial cement from 250’ to 50’ above surface casing shoe (minimum). Verify with CBL.
2) Approval of this permit does not authorize injection. Approval of COGCC Forms 31 and 33 required prior to injection.
|