Wellbore #00 Wellbore Classification: ERIW Status: SI - 5/1/2024 Measured TD: 5815 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: ERIW SI - 5/1/2024 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 11/25/2014 | | Proposed Depth/Form: | 5815 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DSND , Formation: D SAND , Order: 26-60 , Unit Acreage: 1200, Drill Unit: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 0, Drill Unit: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 96 ft., Weight: 28 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 96 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 5812 ft., Weight: 15.5 , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 4369 ft., Bottom: 5812 ft. |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 5/19/1954 | Spud Date Is: | ACTUAL | | Measured TD: | 5815 ft. | Measured PB depth: | 5812 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | Two new logs were run during this conversion to an enhanced recovery well: (1) a CBL across
the D and J sand interval on 12/3/2012 and (2) a CBL across the remedial cement interval
(surface to 250') on 12/10/2012. Both logs have been submitted in digital and hardcopy
formats. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 96 ft., Weight: 28 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 251 ft., Determination Method: CBL | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 5812 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 3306 ft., Bottom: 5812 ft., Determination Method: CALC | | Additional Cement: | String Type: 1ST , Top: 0 ft., Depth: 252 ft., Bottom: 252 ft., Sacks: 60, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 4793 ft. | | | | | FORT HAYS | 5196 ft. | | | | | CARLILE | 5242 ft. | | | | | BENTONITE | 5546 ft. | | | | | D SAND | 5642 ft. | | | | | J SAND | 5712 ft. | | | |
Formation JSND Formation Classification: ERIW Status: SI - 5/1/2024 Interval Top: 5714 ft. Interval Bottom: 5744 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 10/25/2018 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 10/9/2018 | Treatment End Date: | 10/9/2018 | | Treatment Summary: | Loaded hole with 36 bbls water - pumped breakdown @ 4494 psi (8.6 BPM)
Pumped 48 bbls Acid w/191 balls (10% HCL, 10% Acetic)
Pumped 33.5 bbls flush
Pumped 5 bbls over-flush
Max rate 9.1 BPM, Aver rate 7.2 BPM, Max psi 4496, Aver psi 2128 | | Total fluid used in treatment (bbls): | 122 | Max pressure during treatment (psi): | 4496 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 122 | | Fresh water used in treatment (bbls): | 74 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | | | Treatment Date: | 12/10/2012 | Treatment End Date: | N/A | | Treatment Summary: | No treatment of the J sand; the original J sand perforations were abandoned with a CIBP and 2 sacks of cement. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 5637 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/26/2018 | Test Method: | Pumping | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | VENTED | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2100 | | BBLS_OIL | 8 | | BTU_GAS | 1300 | | CALC_BBLS_H2O | 2100 | | CALC_BBLS_OIL | 8 | | CALC_GOR | 1000 | | CALC_MCF_GAS | 8 | | CASING_PRESS | 90 | | GRAVITY_OIL | 43 | | MCF_GAS | 8 | | TUBING_PRESS | 90 |
| | Perforation Data: | | Interval Top: | 5714 ft. | # Of Holes: | 180 | | Interval Bottom: | 5744 ft. | Hole Size: | 0 in. |
|
Formation DSND Formation Classification: ERIW Status: TA - 10/18/2019 Interval Top: 5653 ft. Interval Bottom: 5670 ft.| Completed Information for Formation D SAND | | 1st Production Date: | 3/19/2013 | Choke Size: | | | Formation Name: | D SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 3/19/2013 | Treatment End Date: | 3/19/2013 | | Treatment Summary: | D sand perforated and acidized in preparation for conversion to a water injection well. Acid job was comprised of 750 gallons of 15% HCL and 250 gallons of 10% Acetic acid. Because the well is being converted to an injection well, there is no flowback associated with this acid job. | | Total fluid used in treatment (bbls): | 54 | Max pressure during treatment (psi): | 3218 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | 30 | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation DSND. |
| | Perforation Data: | | Interval Top: | 5653 ft. | # Of Holes: | 68 | | Interval Bottom: | 5670 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (UIC) | Y | Last Use 04/30/2024 |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|