| Engineer | Form: (04) 404326783 08/27/2025 | 1. Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
2. Operator will implement measures to get an initial estimate of the gas flow rate and/or volume from the bradenhead. During the shut-in period record pressure data to adequately characterize the build-up.
3. If a sample has not been collected from surface, intermediate and production casing within the last twelve months collect bradenhead gas samples for laboratory analysis. Sampling will comply with Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling. Copies of all final laboratory analytical results will be provided to the ECMC within three months of collecting the samples.
4. No later than 8/27/2026, conduct a bradenhead test, submit a Form 17, and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the new proposed mitigation plan due to continuous flow at the end of the test, bradenhead test description, and the flow rate information and pressure data. |
| Engineer | Form: (04) 404414314 11/10/2025 | The Form 7, Operators Report of Monthly Operations, must correctly reflect the well status. Submit corrected Form 7 reports no later than 12/15/2025. |