Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-077-08983
Well Classification: GW Status: SI - 5/1/2025
Well Name/No:KNOX #14-7 (F140U)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date5/1/2025
FacilityID:281939LocationID:334083
County:MESA #077Location:SENW 14 8S96W 6
Field:GRAND VALLEY - #31290Elevation:6015 ft.
Basin:PICEANCE BASIN  
Planned Location:1908FNL  1733 FWLLat/Long: 39.352060 / -108.079744Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.352110 / -108.079670Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 5/1/2025             Measured TD: 6490 ft.    Vertical TD: 6199 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 5/1/2025
Wellbore PermitDIRECTIONAL
Permit #:20054393 Expiration Date:12/8/2006
Proposed Top PZ Location:Sec:14 Twp: 8S 96W Footage: 1911 FNL  2026 FEL
Bottom Hole Location:Sec:14 Twp: 8S 96W Footage: 1911 FNL  2026 FEL
Proposed Depth/Form:6496 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit:ORCHARD UNIT Unit Number:COC 66496X
Formation And Spacing:Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:4/17/2006
Spud Date:4/2/2006Spud Date Is:ACTUAL
Measured TD:6490 ft.Measured PB depth:6390 ft.
True Vertical TD:6199 ft.True Vertical PB depth:
Top PZ Location:Sec:14 Twp: 8S 96WFootage: 1911 FNL  2026 FEL
Bottom Hole Location:Sec:14 Twp: 8S 96WFootage: 1911 FNL  2026 FEL
Log Types:PEX,CBL
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 56 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 16 ft., Bottom: 56 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1525 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 960, Top: 0 ft., Bottom: 1560 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6475 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 980, Top: 3162 ft., Bottom: 6577 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.3019 ft.NN
MESAVERDE3020 ft.3433 ft.NN
WILLIAMS FORK3434 ft.5692 ft.NN
ROLLINS5693 ft.5976 ft.NN
COZZETTE5977 ft.6226 ft.NN
CORCORAN6227 ft.6490 ft.NN

Formation CRCRN                   Formation Classification:  GW                   Status:  SI - 5/1/2025                  Interval Top: 6230 ft.    Interval Bottom: 6272 ft.

 Completed Information for Formation CORCORAN
1st Production Date:N/AChoke Size:30.000 in.
Formation Name:CORCORANCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/8/2006
Treatment Summary:STAGES 01 TREATED WITH A TOTAL OF : 2823 BBLS OF SLICKWATER, 103442 LBS 20-40 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:5190 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/28/2006Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 60
BTU_GAS 1170
CALC_BBLS_H2O 60
CASING_PRESS 975
TUBING_PRESS 550
Perforation Data:
Interval Top:6230 ft.# Of Holes:24
Interval Bottom:6272 ft.Hole Size:0.34 in.

Formation COZZ                     Formation Classification:  GW                     Status:  SI - 3/1/2024                  Interval Top: 5977 ft.    Interval Bottom: 5984 ft.

 Completed Information for Formation COZZETTE
1st Production Date:N/AChoke Size:30.000 in.
Formation Name:COZZETTECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/8/2006
Treatment Summary:STAGES 01 TOTAL BBLS OF SLICKWATER LISTED ABOVE.
Tubing Size:2.375 in.Tubing Setting Depth:5190 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/28/2006Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 60
BTU_GAS 1170
CALC_BBLS_H2O 60
CASING_PRESS 975
TUBING_PRESS 550
Perforation Data:
Interval Top:5977 ft.# Of Holes:14
Interval Bottom:5984 ft.Hole Size:0.34 in.

Formation WMFK                     Formation Classification:  GW                     Status:  SI - 5/1/2025                  Interval Top: 4337 ft.    Interval Bottom: 5614 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:6/21/2006Choke Size:30.000 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/24/2006
Treatment Summary:STAGES 02-05 TREATED WITH A TOTAL OF: 9644 BBLS OF SLICKWATER, 334959 LBS 20-40 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:5190 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/22/2006Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 83
BTU_GAS 1170
CALC_BBLS_H2O 83
CALC_MCF_GAS 1997
CASING_PRESS 1061
MCF_GAS 1997
TUBING_PRESS 640
Perforation Data:
Interval Top:4337 ft.# Of Holes:82
Interval Bottom:5614 ft.Hole Size:0.34 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
10/2024 - 09/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)12
GOR
GOR DeterminationMCFE
Average BOE per Day0.006
Average MCFE per Day0.034

 Federal Financial Assurance  i Y

 Tribal Well  i No