Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-073-06561SNOWBIRD
16-15
POLARIS PRODUCTION OPCO LLC
10793
IJ
10/1/2025
ARIKAREE CREEK
2914
LINCOLN  073
SESE 15 6S54W 6
434879View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
400488894
10/08/2013
1) Provide 48 hour notice prior to spud via electronic Form 42. 2) If production casing is set provide cement coverage to at least 200’ above the shallowest completed interval or Lansing-Kansas City, whichever is shallower and across Cheyenne/Dakota interval (5150’ to 4600’ min). Run and submit CBL verify cemented intervals. 3) If well is a dry hole set plugs at the following depths: 40 sks cement +/- 50’ above the Spergen, 40 sks cement +/- 50’ above the Lansing-Kansas City, 40 sks cement across any DST w/ show, 40 sks cement 100’ below Cheyenne (5150’), 40 sks cement 50’ above top of Dakota (4600’), 50 sks cement from 50’ below surface casing shoe up into surface casing, 15 sks cement in top of surface casing, cut 4 ft below GL, weld on plate, 5 sks cement each in rat hole and mouse hole.
EngineerForm: (04)
400778681
03/30/2015
1) If flaring will continue more than 6 months, submit updated requests to flare to COGCC on Form 4 (Sundry Notice), which discusses timing to connect to sales line, plans to develop infrastructure, and justification for continued venting/flaring. 2) The operator is required to obtain and maintain any required air permits from CDPHE. 3) The venting or flaring volumes shall be reported by Form 7, Operator’s Monthly Report of Operations.
EngineerForm: (04)
400809276
03/30/2015
1) If flaring will continue more than 6 months, submit updated requests to flare to COGCC on Form 4 (Sundry Notice), which discusses timing to connect to sales line, plans to develop infrastructure, and justification for continued venting/flaring. 2) The operator is required to obtain and maintain any required air permits from CDPHE. 3) The venting or flaring volumes shall be reported by Form 7, Operator’s Monthly Report of Operations.
EngineerForm: (04)
400982422
03/25/2016
1) Submit requests to flare annually to COGCC on Form 4 (Sundry Notice), which discusses timing to connect to sales line, plans to develop infrastructure, and justification for continued venting/flaring. Provide gas analysis including H2S with each Sundry Notice. 2) Venting or flaring of natural gas shall comply with COGCC Rule 912. 3) Report flaring volumes on Form 7, Operator’s Monthly Report of Operations. 4) Notify the local emergency dispatch or the local governmental designee of natural gas flaring. 5) The operator is required to obtain and maintain any required air permits from CDPHE. The combustion device must comply with applicable design destruction efficiency for hydrocarbons.
UICForm: (02)
401135936
10/24/2016
Injection is not authorized until approval of Subsequent Forms 31 and 33.
UICForm: (02)
401135936
10/24/2016
Operator required to file Form 4 Sundry Notice with all formation tops from surface to at least top of Niobrara as shown on Scout Card.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
ConstructionForm: (02 )
400488894
10/31/2013
Certificate to Discharge Under CDPHE General Permit No. COR-030000 Stormwater Discharges Associated with Construction Certification No. COR031825 Prior to construction, perimeter controls will be installed utilizing cuttings from the clearing operations. Once the well pad has been constructed a variety of BMP's shall be utilized for the site specific conditions. BMP's to be utilized may include, but are not limited to: -Dirt Ditch/Berm -Erosion Control Blankets -Straw Bale Barrier -Straw Wattles -Seeding -Imported Hard Armor -Check Dams -Culvert/Culvert Protection -Crimped Straw -Silt Fence -Surface Roughening/Surface Rip During construction, each site will be inspected every 14 days and 24-72 hours after any precipitation event causing erosion depending on the current site activities. These inspections will be recorded and maintained at Nighthawk's office. Repairs shall be completed as soon as possible after an inspection reporting BMP repairs are required. Any site specific modifications will be revised on the site plan when implemented at the site. A field wide Stormwater Management Plan (SWMP) for the Project Area is located at Nighthawk's office. Spill Protection Control and Countermeasures (SPCC) plans for the Project Area are stored on file at Nighthawk's office. The field wide SWMP addresses SPCC during construction operations.
Storm Water/Erosion ControlForm: (02 )
401135936
11/27/2016
BMP in place - Jolly Ranch area project