Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-073-06561
Well Classification: ERIW Status: IJ - 12/1/2025
Well Name/No:SNOWBIRD #16-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:POLARIS PRODUCTION OPCO LLC - 10793
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:IJStatus Date12/1/2025
FacilityID:434880LocationID:434879
County:LINCOLN #073Location:SESE 15 6S54W 6
Field:ARIKAREE CREEK - #2914Elevation:5241 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:620FSL  772 FELLat/Long: 39.522910 / -103.419150Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.522910 / -103.419150Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: IJ - 12/1/2025             Measured TD: 8400 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        IJ - 12/1/2025
Wellbore Permit
Permit #: Expiration Date:11/26/2018
Proposed Depth/Form:8400 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: ABCK , Formation: ARBUCKLE , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: ATOK , Formation: ATOKA , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: CHRK , Formation: CHEROKEE , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: KDRK , Formation: KINDERHOOK , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: MRRW , Formation: MORROW , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: MRTN , Formation: MARMATON , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: SPGN , Formation: SPERGEN , Order: 556-2 , Unit Acreage: 600, Drill Unit:
Formation And Spacing:Code: STLS , Formation: ST LOUIS , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WRSW , Formation: WARSAW , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: SURF, Hole Size: 12.5 in., Size: 9.625 in., Top: 0 ft., Depth: 332 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 185, Top: 0 ft., Bottom: 332 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8400 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1635, Top: 0 ft., Bottom: 8400 ft.

Wellbore Completed
Completion Date:10/13/2014
Spud Date:9/25/2014Spud Date Is:ACTUAL
Measured TD:8400 ft.Measured PB depth:8266 ft.
True Vertical TD:True Vertical PB depth:
Log Types:Triple Combo
Casing:String Type: SURF, Hole Size: 12.5 in., Size: 9.625 in., Top: 0 ft., Depth: 332 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 185, Top: 0 ft., Bottom: 332 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8400 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1635, Top: 0 ft., Bottom: 8400 ft., Determination Method: VISU
FormationInterval TopLog BottomCoredDSTs
NIOBRARA3740 ft.
FORT HAYS4098 ft.
CARLILE4216 ft.
GREEN RIVER4387 ft.
X BENTONITE4518 ft.
D SAND4620 ft.
J SAND4658 ft.
SKULL CREEK4740 ft.
CHEYENNE4898 ft.
MORRISON4921 ft.
DOCKUM5170 ft.
LYKINS5594 ft.
BLAINE5687 ft.
LYONS5769 ft.
WOLFCAMP6186 ft.
NEVA6471 ft.
FORAKER6559 ft.
VIRGIL6741 ft.
SHAWNEE6795 ft.
HEEBNER6897 ft.
LANSING-KANSAS CITY6910 ft.
MARMATON7221 ft.
CHEROKEE7455 ft.
ATOKA7633 ft.
MORROW7860 ft.
ST LOUIS8047 ft.
SPERGEN8106 ft.
WARSAW8106 ft.
KINDERHOOK8173 ft.
ARBUCKLE8250 ft.

Formation SPGN                     Formation Classification:  OW                     Status:  IJ - 4/1/2025                  Interval Top: 8141 ft.    Interval Bottom: 8174 ft.

 Completed Information for Formation SPERGEN
1st Production Date:11/11/2016Choke Size: 
Formation Name:SPERGENCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:1/26/2017Treatment End Date:N/A
Treatment Summary:Treatment previously reported -changing status to injecting Adjusted tubing
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:10/17/2016Treatment End Date:10/18/2016
Treatment Summary:Perf'd Lower SPGN adding depth 8,160' - 8,174' (84 holes) Drilled out CIBP @ 8,130' that abandoned the SPGN back on 10/22/14. 300 bbls produced water with additives 111 gallons pumped (Biocide - scale inhibitor & iron sequestering agent)
Total fluid used in treatment (bbls):303Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):3Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):300Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:10/21/2014Treatment End Date:10/22/2014
Treatment Summary:Perf'd 8,141' - 8,146'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:8085 ft.
Tubing Packer Depth:8082 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation SPGN.
Perforation Data:
Interval Top:8141 ft.# Of Holes:114
Interval Bottom:8174 ft.Hole Size:0.52 in.

Formation CHRK                     Formation Classification:  ERIW                     Status:  AB - 11/8/2016                 Interval Top: 7428 ft.    Interval Bottom: 7431 ft.

 Completed Information for Formation CHEROKEE
1st Production Date:11/10/2014Choke Size: 
Formation Name:CHEROKEECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/12/2016Treatment End Date:N/A
Treatment Summary:Previously reported - AB CHRK
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:10/22/2014Treatment End Date:10/23/2014
Treatment Summary:Acidized with 500 gallons of 15% HCI and displaced with 45 bbls of 2% KCI water
Total fluid used in treatment (bbls):57Max pressure during treatment (psi):1310
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):45Total flowback volume recovered (bbls):72
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CHRK.
Perforation Data:
Interval Top:7428 ft.# Of Holes:18
Interval Bottom:7431 ft.Hole Size:0.48 in.

Formation MRTN                     Formation Classification:  ERIW                     Status:  AB - 11/8/2016                 Interval Top: 7266 ft.    Interval Bottom: 7404 ft.

 Completed Information for Formation MARMATON
1st Production Date:11/10/2014Choke Size: 
Formation Name:MARMATONCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:10/12/2016Treatment End Date:N/A
Treatment Summary:Previously reported -AB MRTN
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:10/4/2016Treatment End Date:10/18/2016
Treatment Summary:No formation treatment done - Squeeze
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:10/27/2014Treatment End Date:10/31/2014
Treatment Summary:Acidized with 1200 gallons of 15% HCI and displaced with 45 bbls of 2% KCI water in perf's 7,396'-7,404' Came uphole and Perf'd 7,266'-7,274'- Acidized with another 1200 gallons of 15% HCI and displaced with 44 bbls of 2% KCI water
Total fluid used in treatment (bbls):146Max pressure during treatment (psi):1100
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):57Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):140
Fresh water used in treatment (bbls):89Disposition method For flowback:DISPOSAL
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation MRTN.
Perforation Data:
Interval Top:7266 ft.# Of Holes:96
Interval Bottom:7404 ft.Hole Size:0.48 in.

Formation MT-CRK                 Formation Classification:  ERIW                 Status:  CM - 11/8/2016                 Interval Top: 7266 ft.    Interval Bottom: 7431 ft.

 Completed Information for Formation MARMATON-CHEROKEE
1st Production Date:N/AChoke Size: 
Formation Name:MARMATON-CHEROKEECommingled:
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/12/2016Treatment End Date:N/A
Treatment Summary:No formation treatment done - Squeeze AB commingled zone
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 521
CALC_BBLS_OIL 521
CASING_PRESS 3
GRAVITY_OIL 38
TUBING_PRESS 60
Perforation Data:
Interval Top:7266 ft.# Of Holes:114
Interval Bottom:7431 ft.Hole Size:0.48 in.
Primary Well Designation:
Noticed Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
11/05/2024
Defined Inactive (UIC)YDefined Inactive
03/31/2018
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No