WELL05-073-06455Mahalo
3
WIEPKING-FULLERTON ENERGY LLC
96340
PR
6/1/2020
GREAT PLAINS
32756
LINCOLN  073
NWNE 29 10S55W 6
423645View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02 )
400164378
5/16/2011
1) Provide 24 hour notice of MIRU to Craig Quint at 719-767-8939 or e-mail at craig.quint@state.co.us. 2) If production casing is set provide cement coverage to at least 200’ above CHRK, and stage cement Cheyenne/Dakota interval (4550’-4000’ minimum). Run and submit CBL to verify cemented intervals. 3) If well is a dry hole set plugs at the following depths: 40 sks cement +/- 50’ above the Cherokee, 40 sks cement across any DST w/ show, 40 sks cement 50’ below Cheyenne (4600’ up), 40 sks cement 50’ above top of Dakota (3950’ up), 50 sks cement from 50’ below surface casing shoe up into surface casing, 15 sks cement in top of surface casing, cut 4 ft below GL, weld on plate, 5 sks cement each in rat hole and mouse hole.
EnvironmentalForm: (04 )
400961327
12/31/2015
Operator will submit Form 27 remediation plan by February 29, 2016. No form 19 spill report will be required.
Reclamation SpecialistForm: (04 )
402822668
12/20/2021
COGCC will not require further action at this time. If any future disturbances (i.e., subsequent operations) affect interim reclamation vegetation, Operator shall reclaim all disturbances as early as practicable to meet Rule 1003 standards. Should future conditions at the site indicate poor growth that is not reflective of reference areas, then further investigation and reclamation activities may be required.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
ConstructionForm: (02 )
400164378
6/17/2011
Description of Well Site and Construction Area 1-3 acre site with access road for drilling of oil and gas well. Terrain is flat with native grass and sagebrush. No receiving waters will be affected by well pad. Silt fences will be installed on low side site of drill site. Drilling pits closed and reclaimed with the drillsite. Topsoil will be separated and spread on drill site as final operation before reseeding operations which will be completed within 6 months weather permitting. To prevent soil erosion site will be disked and straw crimped in or manure spread.
Material Handling and Spill PreventionForm: (02 )
400164378
6/17/2011
Spill Prevention, Control and Countermeasure Plan is on file in Wiepking- Fullerton Energy, L.L.C. office.
Storm Water/Erosion ControlForm: (02 )
400164378
6/17/2011
BMP Plan Wiepking-Fullerton Energy, L.L.C. 4600 S. Downing St. Englewood, CO 80113 303-789-1798 303-761-9067 (fax) Certification to Discharge Under CDPS General Permit COR-03000 Stormwater Discharges Associated with Construction Certification Number COR 39788 Mahalo # 3 well T10S, R55W Sec. 29: NW1/4NE1/4 Lincoln County, Colorado Description of Well Site and Construction Area 1-3 acre site with access road for drilling of oil and gas well. Terrain is flat with native grass and sagebrush. No receiving waters will be affected by well pad. Silt fences will be installed on low side site of drill site. Drilling pits closed and reclaimed with the drillsite. Topsoil will be separated and spread on drill site as final operation before reseeding operations which will be completed within 6 months weather permitting. To prevent soil erosion site will be disked and straw crimped in or manure spread. Stormwater Management Plan (SWMP) is on file in Wiepking-Fullerton Energy, L.L.C. office. Spill Prevention, Control and Countermeasure Plan is on file in Wiepking-Fullerton Energy, L.L.C. office.