|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 6/1/2020 Measured TD: 7900 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 6/1/2020 | Wellbore Permit | | Permit #: | | Expiration Date: | 6/16/2013 | Proposed Depth/Form: | 7900 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CHRK , Formation: CHEROKEE , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: MRRW , Formation: MORROW , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: MRTN , Formation: MARMATON , Order: , Unit Acreage: , Drill Unit: | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 300 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 250, Top: 0 ft., Bottom: 300 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7900 ft., Weight: 17 , Citings Type: PLANNED | Cement: | Sacks: 300, Top: 6500 ft., Bottom: 7900 ft. | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: PLANNED | Cement: | Sacks: , Top: 4000 ft., Bottom: 4550 ft. |
| | |
Wellbore Completed | Completion Date: | 9/5/2012 | Spud Date: | 8/24/2012 | Spud Date Is: | ACTUAL | Measured TD: | 7900 ft. | Measured PB depth: | 7831 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | Compensated Density Compensated Neutron Gamma Ray
High Resolution Induction
VDL CCL Gamma-Ray Cement Bond Log | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 298 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 155, Top: 0 ft., Bottom: 298 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7898 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 260, Top: 5270 ft., Bottom: 7898 ft., Determination Method: CBL | Additional Cement: | String Type: S.C. 1.1 , Top: 3530 ft., Depth: 4547 ft., Bottom: 4547 ft., Sacks: 250, Method: STAGE TOOL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 3052 ft. | | | | CODELL | 3615 ft. | | | | SHAWNEE | 6322 ft. | | | | LANSING | 6589 ft. | | | | MARMATON | 6941 ft. | | | | CHEROKEE | 7058 ft. | | | | MORROW | 7747 ft. | | | | KEYES | 7771 ft. | | | |
Formation CHRK Formation Classification: OW Status: PR - 6/1/2020 Interval Top: 7067 ft. Interval Bottom: 7084 ft. Completed Information for Formation CHEROKEE | 1st Production Date: | 10/15/2012 | Choke Size: | | Formation Name: | CHEROKEE | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | ACID JOB | Treatment Date: | 9/7/2012 | Treatment End Date: | 9/8/2012 | Treatment Summary: | Acid Job 40 bbl 15% HCL, 42 bbl 2% KCL | Total fluid used in treatment (bbls): | 82 | Max pressure during treatment (psi): | 500 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | 40 | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 96 | Fresh water used in treatment (bbls): | 42 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: PIPELINE |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7031 ft. | Tubing Packer Depth: | 6994 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/8/2012 | Test Method: | SWAB | Hours Tested: | 8 | Gas Type: | DRY | Gas Disposal: | VENTED | |
Test Type | Measure |
---|
BBLS_OIL | 32 | BTU_GAS | 1200 | CALC_BBLS_OIL | 96 | CALC_MCF_GAS | 120 | GRAVITY_OIL | 35 | MCF_GAS | 40 |
| Perforation Data: | Interval Top: | 7067 ft. | # Of Holes: | 45 | Interval Bottom: | 7084 ft. | Hole Size: | 0.25 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 817 |
Total Gas Produced (MCF) | 1555 |
GOR | 1903 |
GOR Determination | BOE |
Average BOE per Day | 2.970 |
Average MCFE per Day | 17.213 |
Federal Financial Assurance | i | |
|
|