| Engineer | Form: (06) 2285236 02/01/2012 | 1) Provide 24 hour notice of MIRU to Craig Quint at 719-767-8939 or e-mail at craig.quint@state.co.us.
2) Run CBL from 6600’ to 4000’ to confirm any cemented intervals.
3) 80 sack cement plug perf and squeeze @ at 450’ - Tag plug. Where is your 1” x 75 sx top up on the intermediate? Assumed it to be above 13 3/8” shoe. 15 sack cement plug at surface – Set plug 50’ to surface in 8 5/8” casing and 8 5/8” x 13” annulus.
|
| Engineer | Form: (04) 401617131 07/10/2018 | This approval is good for one year and a new application must be made before December 04, 2019(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
|
| Engineer | Form: (04) 403191994 10/10/2022 | As per rule 434, this well is designated inactive and must be properly returned to production, plugged and abandoned, have an approved Form 5B or be submitted on a Form 6A (to be designated as Out of Service) no later than no later than November 1, 2022.2) The Form 7, Operators Report of Monthly Operations, must correctly reflect the well status. |
| Engineer | Form: (02) 403780071 08/14/2024 | Drilling/Completion Operations Operator to control emissions and venting during flowback. |
| Engineer | Form: (02) 403780071 08/14/2024 | Drilling/Completion Operations Operator to submit a Form 5A to document new formation completion |
| Engineer | Form: (04) 403921765 09/25/2024 | If flowback event last more than 4 days, reach out to ECMC for further guidelines. |
| Engineer | Form: (04) 403921765 09/25/2024 | The residual gas will be an enclosed combustion device with a 98% design destruction efficiency for hydrocarbons. Operator shall manage this well so that production volumes do not exceed the combustor capacity. |
| Engineer | Form: (04) 403921765 09/25/2024 | If well becomes a producing well, it will be shut in and a Gas Capture Plan will be submitted. |