COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02 )
400144526
3/28/2011
1) Provide 48 hour notice of MIRU to John Duran at 719-846-4715 or email John.Duran@state.co.us. 2) Provide cement coverage of production casing from TD to 50' above surface casing shoe. Verify coverage with cement bond log.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
ConstructionForm: (02 )
400144526
5/10/2011
Prior to construction perimeter controls will be installed utilizing cuttings from the clearing operations. Brush Barriers shall be placed down gradient of the disturbance. Once the well pad has been constructed a variety of B.M.P.’s shall be utilized for the site specific conditions. These devices may include but are not limited to: • Brush Barriers • Dirt Berm/Bar Ditch • Clean Water Run on Diversion • Seeding • Erosion Control Blankets • Mulch Tackifier • Rip-Rap During construction each site will be inspected every 14 days and 72 hours after any major storm event. These inspections will be recorded and maintained at the XTO office. Repairs shall be completed within 7 days of the initial inspection. Any modifications shall be revised on the site plan and then implemented at the site.
WildlifeForm: (02 )
400144526
5/10/2011
Wildlife BMP required for Raton Basin utilize bear proof dumpsters and trash receptacles for food related trash at all facilities that generate such trash.
 Form: (02 )
400144526
5/10/2011
A Field Wide Stormwater Management Plan (SWMP) for the Raton Basin is on file at the XTO Energy Inc. office. A Site Specific SWMP with a Site Plan will be developed for each location and can be found in: • Appendix F- Apache Canyon Lease • Appendix G- Golden Eagle Lease • Appendix H- Hill Ranch Lease • Appendix I- New Elk Lease
Material Handling and Spill PreventionForm: (02 )
400144526
5/10/2011
Spill Prevention and Counter Measures (SPCC) for the Raton Basin is on file at the XTO Energy Inc. office. The Field SWMP and Site Specific SWMP each address SPCC during construction operations.