|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 10/1/2025 Measured TD: 2555 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 10/1/2025 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 5/9/2013 | | Proposed Depth/Form: | 2549 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | STATE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 45 ft., Weight: 54 , Citings Type: PLANNED | | Cement: | Sacks: 98, Top: 0 ft., Bottom: 45 ft. | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 785 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 520, Top: 0 ft., Bottom: 785 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2549 ft., Weight: 15.5 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 1861 ft., Bottom: 2549 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1861 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 290, Top: 0 ft., Bottom: 1861 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/9/2011 | | Spud Date: | 6/6/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 2555 ft. | Measured PB depth: | 2497 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DEN/NEU, IND, CBL | | Casing: | String Type: CONDUCTOR, Hole Size: 18 in., Size: 13.375 in., Top: 0 ft., Depth: 46 ft., Weight: 54.50 , Citings Type: ACTUAL | | Cement: | Sacks: 124, Top: 0 ft., Bottom: 46 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 814 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 363, Top: 0 ft., Bottom: 814 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2544 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 335, Top: 50 ft., Bottom: 2544 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 818 ft., Depth: , Bottom: 1199 ft., Sacks: 150, Method: 1 INCH | | Additional Cement: | String Type: 1ST , Top: 0 ft., Depth: , Bottom: 818 ft., Sacks: 93, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | | N | N | | VERMEJO COAL | 2009 ft. | | N | N | | TRINIDAD | 2390 ft. | | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 10/20/2011 Interval Top: 2300 ft. Interval Bottom: 2340 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | 8/9/2011 | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/22/2011 | | Treatment Summary: | Acidized w/750 gals 15% HCl acid. Frac'd w/29,142 gals 20# Delta 140 w/Sandwedge OS carrying 72,452# 16/30 Nebraska sd. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation VRMJ. |
| | Perforation Data: | | Interval Top: | 2300 ft. | # Of Holes: | 18 | | Interval Bottom: | 2340 ft. | Hole Size: | 0.42 in. |
|
Formation RT-VJ Formation Classification: GW Status: PR - 10/1/2025 Interval Top: 826 ft. Interval Bottom: 2340 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | 8/9/2011 | Choke Size: | | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2396 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/3/2011 | Test Method: | Pumping | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 46 | | BTU_GAS | 996 | | CALC_BBLS_H2O | 46 | | CALC_MCF_GAS | 48 | | MCF_GAS | 48 | | TUBING_PRESS | 2 |
| | Perforation Data: | | Interval Top: | 826 ft. | # Of Holes: | 69 | | Interval Bottom: | 2340 ft. | Hole Size: | 0.42 in. |
|
Formation RTON Formation Classification: GW Status: CM - 10/20/2011 Interval Top: 826 ft. Interval Bottom: 1166 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | 8/9/2011 | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/22/2011 | | Treatment Summary: | Acidized w/1,500 gals 15% HCl acid. Frac'd w/93,590 gals 20# Delta 140 w/Sandwedge OS carrying 200,727# 16/30 Nebraska sd. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation RTON. |
| | Perforation Data: | | Interval Top: | 826 ft. | # Of Holes: | 51 | | Interval Bottom: | 1166 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|