| OGLA | Form: (06) 403018772 04/28/2022 | Operator will implement measures to capture, combust, or control emissions to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public health, welfare and the environment. |
| OGLA | Form: (06) 403018772 04/28/2022 | Since this well is located within the Bosque del Oso State Wildlife Area (SWA), operator will consult with CPW when plugging and abandonment (PA) of wells located within CPW-owned SWA to develop measures to avoid, minimize, and mitigate conflicts during hunting seasons that may arise between hunters and site operations. |
| OGLA | Form: (06) 403018772 04/28/2022 | This Oil and Gas Location is within a CPW mapped Elk Production area. CPW recommends that plugging and abandonment (PA) operations should not take place from May 15 to June 30. If operations must take place from May 15 to June 30, operator will consult with CPW to determine site-specific measures to avoid, minimize, and mitigate adverse impacts to wildlife and the environment. |
| Engineer | Form: (06) 403018772 05/25/2022 | 1)Perform bradenhead test prior to MIRU if test has not been performed within six months of plugging. Submit results on Form 17. Contact area environmental protection specialist for sampling and analysis requirements if initial bradenhead pressure is greater than 25 psi.
2)Operator shall implement measures to control unnecessary and excessive venting and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare, health and safety.
3)Prior to placing the surface casing shoe plug: verify that all fluid migration (liquid and gas) has been eliminated. If evidence of fluid migration or pressure remains, contact COGCC Engineer for an update to plugging orders.
4)Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations and electronic Form 42 Notice of Plugging Operations 48 hours prior to mobilizing for plugging operations.
5)The approved Form 6, Notice of Intent will be at the location during all phases of plugging operations.
6)Properly abandon flowlines as per Rule 1105. Pursuant to Rule 911.a. Closure of Oil and Gas Facilities, Operator will submit Site Investigation and Remediation Workplans via Form 27 for COGCC prior approval before cutting and capping the plugged well, conducting flowline abandonment, and removing production equipment. Pursuant to Rule 1105.f. Abandonment Verification, within 90 days of an operator completing abandonment requirements for a flowline or crude oil transfer line, an operator must submit a Field Operations Notice, Form 42-Abandonment of Flowlines for on-location flowlines, and a Flowline Report, Form 44, for off-location flowlines or crude oil transfer lines.
|
| Engineer | Form: (06) 403018772 05/25/2022 | Verify existing cement coverage by CBL – submit to COGCC for verification of plugging orders prior to continuing plugging operations. |