|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: SI - 8/1/2022 Measured TD: 2162 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM SI - 8/1/2022 | | Wellbore Permit | | | Permit #: | 19890679 | Expiration Date: | 12/20/1989 | | Proposed Depth/Form: | 2450 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RT-VJ , Formation: RATON-VERMEJO COALS , Order: , Unit Acreage: 640, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 2/17/1990 | | Spud Date: | 10/8/1999 | Spud Date Is: | ACTUAL | | Measured TD: | 2162 ft. | Measured PB depth: | 2100 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | LDT/CNTG/NGT; ML/NGT; SDT/GR | | Casing: | String Type: SURF, Hole Size: , Size: 8.625 in., Top: 0 ft., Depth: 200 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 170, Top: 0 ft., Bottom: 200 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2162 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 60, Top: 2060 ft., Bottom: 2162 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 1709 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 282, Top: 1090 ft., Bottom: 1720 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | | N | N | | VERMEJO COAL | 1574 ft. | | N | N | | TRINIDAD | 1950 ft. | | N | N | | PIERRE | 2076 ft. | | N | N |
Formation RTON Formation Classification: GW Status: SI - 8/1/2022 Interval Top: 680 ft. Interval Bottom: 910 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | 2/17/1990 | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | | | Production Method: | ROD PUMP | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/17/1990 | | Treatment Summary: | 680' - 910' FRAC W/ 65% FOAM 101,240 GL. 434,000# 12/16 SAND |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1114 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/20/1990 | Test Method: | ROD PUMP | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | FLARED | |
| Test Type | Measure |
|---|
| BBLS_H2O | 644 | | CALC_BBLS_H2O | 644 | | CALC_MCF_GAS | 22 | | CASING_PRESS | 5 | | MCF_GAS | 22 |
| | Perforation Data: | | Interval Top: | 680 ft. | # Of Holes: | 202 | | Interval Bottom: | 910 ft. | Hole Size: | 0.7 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/13/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2027 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|