Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-067-09768MANKINS HOWARD GU
4
BP AMERICA PRODUCTION COMPANY
10000
AL
9/11/2013
IGNACIO BLANCO
38300
LA PLATA  067
SENE 10 34N7W N
306759View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
AgencyForm: (02 )
2585682
3/26/2010
1)Provide 48 hour notice of spud to COGCC field inspector Leslie Melton (970) 375-6419 or les.melton@state.co.us 2)Provide cement coverage of production casing from TD to surface. Verify cement coverage with Cement Bond Log. 3)Run and submit Directional Survey from TD to kick-off point 4)The operator shall comply with Rule 321, and it shall be the operator’s responsibility to ensure that the well bore complies with setback requirements in Commission orders and/or rules prior to producing the well. 5)Sample and test two closest water wells within 1/4 mile swath of the directional wellbore intercepting Fruitland Coal (includes pathway from top to bottom of pay). 6)Operators are required to obtain a bottom hole pressure utilizing a bottom hole gauge after a minimum 48 hour shut-in period following completion and prior to sales 7)Comply with all applicable provisions of Order 112-214
 
COGIS - Best Management Practice Results
No records to display.