| Engineer | Form: (02) 400502481 03/31/2014 | (1) COMPLIANCE WITH THE MOST CURRENT REVISION OF THE NORTHWEST COLORADO NOTIFICATION POLICY IS REQUIRED. SEE ATTACHED NOTICE.
(2) COMPLIANCE WITH THE MOST CURRENT REVISION OF THE GARFIELD COUNTY RULISON FIELD NOTICE TO OPERATORS IS REQUIRED, WITH THE FOLLOWING EXCEPTION: ALL FIELD NOTICE REQUIREMENTS SPECIFIED IN THIS NOTICE TO OPERATORS ARE SUPERSEDED BY THE REQUIREMENTS OF THE MOST CURRENT REVISION OF THE NORTHWEST COLORADO NOTIFICATION POLICY (SEE CONDITION OF APPROVAL #1). SEE ATTACHED NOTICE.
(3) CEMENT ON INTERMEDIATE CASING (9+5/8" FIRST STRING) MUST BE A MINIMUM OF 200' ABOVE THE TOP OF THE MESA VERDE FORMATION (OR 200' ABOVE THE OHIO CREEK FORMATION IF PRESENT). CEMENT TOP VERIFICATION BY CBL IS REQUIRED.
|
| Permit | Form: (02) 400502481 05/29/2014 | Open hole resistivity and gamma logs shall be run to describe the stratigraphy of the entire well bore and to adequately verify the setting depth of surface casing and aquifer coverage. On a multi-well pad, these open hole logs are only required on one of the first wells drilled on the pad and the Drilling Completion Report - Form 5 for every well on the pad shall identify which well was logged.
|
| OGLA | Form: (04) 400706460 10/17/2014 | A closed loop system must be implemented during drilling; or, if a drilling pit is constructed, an amended Form 2A must be submitted and a Form 15 submitted if operator plans on using either oil based mud or high chloride/TDS mud. The pit must be lined. All cuttings generated during drilling with oil based mud or high chloride/TDS mud shall be segregated from uphole (water based drilling mud generated) cuttings and must be kept in the lined drilling pit (if permitted and constructed), tanks/containers, or placed on a lined/bermed portion of the well pad; prior to disposition. The moisture content of any drill cuttings in a cuttings containment area or pile shall be as low as practicable to prevent accumulation of liquids greater than de minimis amounts. At the time of closure, if the drill cuttings are to be left onsite, they must also meet the applicable standards of Table 910-1. Representative cuttings samples will be analyzed for all Table 910-1 constituents. Any material which does not meet Table 910-1 criteria will either be manifested and disposed offsite at an approved commercial facility, sent to a permitted WPX Cuttings Management Trench for additional amending, or amended further onsite to comply with Table 910-1. If operator determines that long-term onsite management of oil based mud or high chloride/TDS mud cuttings is necessary, an approved Form 27 remediation plan will be required. All liners associated with oil based or high chloride/TDS drilling mud and cuttings must be disposed of offsite per CDPHE rules and regulations. |
| OGLA | Form: (04) 400706460 10/17/2014 | Operator shall adhere to all BLM COAs listed on the BLM approved Sundry (attached to this COGCC Form 4 Sundry). |