Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22453
Well Classification: GW Status: PR - 3/3/2015
Well Name/No:GM #703-4-HN1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC24603
Facility Status:PRStatus Date3/3/2015
FacilityID:438085LocationID:334636
County:GARFIELD #045Location:LOT 5 4 7S96W 6
Field:PICEANCE HORIZONTAL NIOBRARA - #68810Elevation:5681 ft.
Basin:PICEANCE BASIN  
Planned Location:1977FNL  1405 FWLLat/Long: 39.467836 / -108.117369Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.467836 / -108.117372Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/7/2015
End Date: 1/19/2015
Reported: 3/16/2015
Days to report: 56
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/3/2015             Measured TD: 16320 ft.    Vertical TD: 10105 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/3/2015
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/10/2016
Proposed Top PZ Location:Sec:4 Twp: 7S 96W Footage: 1822 FNL  1398 FWL
Bottom Hole Location:Sec:9 Twp: 7S 96W Footage: 2052 FNL  1429 FWL
Proposed Depth/Form:16331 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: MNCS , Formation: MANCOS , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 52.7# , Citings Type: PLANNED
Cement:Sacks: 40, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 2506 ft., Weight: 68# , Citings Type: PLANNED
Cement:Sacks: 828, Top: 0 ft., Bottom: 2506 ft.
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 9717 ft., Weight: 53.5# , Citings Type: PLANNED
Cement:Sacks: 1136, Top: 4388 ft., Bottom: 9717 ft.
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 16331 ft., Weight: 23# , Citings Type: PLANNED
Cement:Sacks: 923, Top: 8717 ft., Bottom: 16331 ft.
Casing:String Type: STAGE TOOL, Hole Size: 12.25 in., Size: 9.625 in., Top: , Depth: 4388 ft., Weight: 53.5# , Citings Type: PLANNED
Cement:Sacks: 661, Top: 1506 ft., Bottom: 4388 ft.

Wellbore Completed
Completion Date:11/18/2014
Spud Date:9/8/2014Spud Date Is:ACTUAL
Measured TD:16320 ft.Measured PB depth:16261 ft.
True Vertical TD:10105 ft.True Vertical PB depth:10113 ft.
Top PZ Location:Sec:4 Twp: 7S 96WFootage: 1822 FNL  1398 FWL
Bottom Hole Location:Sec:9 Twp: 7S 96WFootage: 2052 FNL  1429 FWL
Log Types:MUD/RPM/CBL - No OH logs were run on this well.
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 125 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 47, Top: 0 ft., Bottom: 125 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 2530 ft., Weight: 68 , Citings Type: ACTUAL
Cement:Sacks: 895, Top: 0 ft., Bottom: 2530 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 9629 ft., Weight: 53.5 , Citings Type: ACTUAL
Cement:Sacks: 1565, Top: 3586 ft., Bottom: 9629 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 16312 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 1080, Top: 9684 ft., Bottom: 16312 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 1290 ft., Depth: 3586 ft., Bottom: 3586 ft., Sacks: 570, Method: DV TOOL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1927 ft.
WILLIAMS FORK3378 ft.
MESAVERDE3378 ft.
CAMEO5930 ft.
ROLLINS6395 ft.
COZZETTE6659 ft.
CORCORAN6893 ft.
SEGO7091 ft.
NIOBRARA10240 ft.

Formation NBRR                     Formation Classification:  GW                     Status:  PR - 3/3/2015                  Interval Top: 10765 ft.    Interval Bottom: 16036 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/26/2015Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/7/2015Treatment End Date:1/19/2015
Treatment Summary:80048 Gals 15% HCL; 251811 BBLs Slickwater; 2393707 100/Mesh; 4203693 #40/70 Sand; (summary)
Total fluid used in treatment (bbls):253717Max pressure during treatment (psi):12368
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:21
Total acid used in treatment (bbls):1906Min frac gradient (psi/ft):1.05
Recycled water used in treatment (bbls):251811Total flowback volume recovered (bbls):9621
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):6597400Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:10263 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/3/2015Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 970
CALC_MCF_GAS 7555
CASING_PRESS 4567
MCF_GAS 7555
TUBING_PRESS 3927
Perforation Data:
Interval Top:10765 ft.# Of Holes:672
Interval Bottom:16036 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)66
Total Gas Produced (MCF)51117
GOR774500
GOR DeterminationMCFE
Average BOE per Day24.327
Average MCFE per Day141.103

 Federal Financial Assurance  i Y

 Tribal Well  i No