Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-045-15444WILLIAMS
RWF 41-33
TEP ROCKY MOUNTAIN LLC
96850
PR
9/30/2008
RULISON
75400
GARFIELD  045
SENE 33 6S94W 6
311599View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (04)
404165369
04/21/2025
Operator committed to the following Best Management Practices in the attached email of the CPW consultation: Mule Deer and Elk BMPs: 1. Wildlife – Minimization: To minimize the potential for wildlife related traffic accidents, TEP has implemented speed restrictions for all lease roads and requires that all TEP employees and contractors adhere to these posted speed restrictions. 2. Wildlife – Minimization: TEP will make best efforts to minimize operations at these location during winter months by conducting operations, when possible, between 9:00am to 4:00pm when wildlife activity minimal. 3. Wildlife – Minimization: TEP will minimize vehicle numbers and traffic by carpooling to the site whenever possible.
EngineerForm: (04)
404165369
04/22/2025
1) For applicable operations, report work completed within 30 days on a Form 4 Sundry REPORT OF WORK DONE - Repair Well noting final pressure test results and include any operational or job summaries. If the wellbore geometry changes or there is not an updated WBD in the well file submit an updated WBD. 2) For applicable operations, submit a Form 5 or 5A (updated packer and tubing depths) within 30 days of the work with job related documents including a minimum of one of the following attachments: operations summary, cement job summary and/or wireline summary. Additionally, include CBL’s and any additional logs run. 3) Complete a bradenhead test within 30 days of completing the repair and submit results on a Form 17 4) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations 5) Operator shall notify ECMC Engineering staff prior to pumping cement or if changes to the approved repair procedure are required.
EngineerForm: (04)
404165369
04/22/2025
Well to be repaired within 6 months of identifying integrity issue (8/13/2025). Pressure is to be managed and mitigated until plugging or repair is complete.
EngineerForm: (04)
404156007
04/22/2025
1. Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare. 2. Well to be repaired within 6 months of identifying integrity issue (8/13/2025). Pressure is to be managed and mitigated until repair is complete. 3. Shut in bradenhead pressure shall not exceed threshold pressure.
 
COGIS - Best Management Practice Results
No records to display.