Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15444
Well Classification: GW Status: PR - 9/30/2008
Well Name/No:WILLIAMS #RWF 41-33
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 52584
Facility Status:PRStatus Date9/30/2008
FacilityID:137LocationID:311599
County:GARFIELD #045Location:SENE 33 6S94W 6
Field:RULISON - #75400Elevation:5325 ft.
Basin:PICEANCE BASIN  
Planned Location:1453FNL  1031 FELLat/Long: 39.485056 / -107.887207Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.485056 / -107.887209Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/30/2008             Measured TD: 7820 ft.    Vertical TD: 7644 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/30/2008
Wellbore PermitDIRECTIONAL
Permit #:20076732 Expiration Date:1/29/2009
Proposed Top PZ Location:Sec:33 Twp: 6S 94W Footage: 225 FNL  742 FEL
Bottom Hole Location:Sec:33 Twp: 6S 94W Footage: 225 FNL  742 FEL
Proposed Depth/Form:7776 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-64 , Unit Acreage: 320, Drill Unit: E2

Wellbore Completed
Completion Date:3/23/2008
Spud Date:6/9/2008Spud Date Is:ACTUAL
Measured TD:7820 ft.Measured PB depth:7770 ft.
True Vertical TD:7644 ft.True Vertical PB depth:
Top PZ Location:Sec:33 Twp: 6S 94WFootage: 225 FNL  742 FEL
Bottom Hole Location:Sec:33 Twp: 6S 94WFootage: 225 FNL  742 FEL
Log Types:CBL, HIGH RES.IND.,SPECTRAL DENS.,DUAL SPACED NEUTRON; MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1711 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 488, Top: 0 ft., Bottom: 1711 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7802 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1030, Top: 2891 ft., Bottom: 7802 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1526 ft.NN
MESAVERDE4025 ft.NN
CAMEO6770 ft.NN
ROLLINS7650 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/30/2008                 Interval Top: 5744 ft.    Interval Bottom: 7563 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/22/2008Choke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/18/2008
Treatment Summary:3548 GALS 7.5% HCL; 736,000# 20/40 SAND; 22,271 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:7086 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/30/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 988
CASING_PRESS 1220
MCF_GAS 988
TUBING_PRESS 1041
Perforation Data:
Interval Top:5744 ft.# Of Holes:132
Interval Bottom:7563 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)28
Total Gas Produced (MCF)15592
GOR556857
GOR DeterminationMCFE
Average BOE per Day7.445
Average MCFE per Day43.197

 Federal Financial Assurance  i Y

 Tribal Well  i No