Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-045-15147PARACHUTE RANCH FED.
35-31C
QB ENERGY OPERATING LLC
10844
SI
12/1/2017
GRAND VALLEY
31290
GARFIELD  045
NWNE 35 7S96W 6
334365View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
UICForm: (04)
401696118
07/16/2018
Operator has permission to defer collecting 5-year water sample and performing analysis until well is returned to injection. Sampling and analysis required within 30 days of when well returned to injection.
EngineerForm: (04)
403219606
12/01/2022
1) At the conclusion of the 6 months from BH test date (3/01/23), submit a Form 4 BHP Sundry that summarizes current well condition. The sundry should include details of the future plans, flow information, number of times well was blown down, pressure data and a discussion of the abatement history for the previous 6 months. 3) Operator shall comply with COGCC Rule 419. Bradenhead Monitoring, Testing, and Reporting and Rule 420. Form 17, Bradenhead Test Report 4) At least once a year shut in bradenhead for 7 days or until the pressure reaches the bradenhead threshold and perform a bradenhead test. Report results on a Form 17, as specified in Rule 420 or other Director approved submittal method.
EngineerForm: (04)
403541523
11/15/2023
1) Operator shall comply with COGCC Rule 419. Bradenhead Monitoring, Testing, and Reporting and Rule 420. Form 17, Bradenhead Test Report or other Director approved submittal method. 2) Comply with any CDPHE, Air Pollution Control Division rules or requirements for all atmospheric discharges. 3) Any liquids blown down are to be collected, stored, handled, and treated or disposed as E&P waste per COGCC’s 900 series rules.
 
COGIS - Best Management Practice Results
No records to display.