Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15147
Well Classification: DSPW Status: SI - 12/1/2017
Well Name/No:PARACHUTE RANCH FED. #35-31C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC-64739
Facility Status:SIStatus Date12/1/2017
FacilityID:293864LocationID:334365
County:GARFIELD #045Location:NWNE 35 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5464 ft.
Basin:PICEANCE BASIN  
Planned Location:923FNL  1535 FELLat/Long: 39.398790 / -108.073021Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.398778 / -108.073042Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: DSPW             Status: SI - 12/1/2017             Measured TD: 6197 ft.    Vertical TD: 6162 ft.

 Wellbore Data for Original WellboreWellbore Classification: DSPW        SI - 12/1/2017
Wellbore PermitDIRECTIONAL
Permit #:20087686 Expiration Date:1/19/2010
Proposed Top PZ Location:Sec:35 Twp: 7S 96W Footage: 824 FNL  2010 FEL
Bottom Hole Location:Sec:35 Twp: 7S 96W Footage: 824 FNL  2010 FEL
Proposed Depth/Form:6800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: ILES , Formation: ILES , Order: 510-36 , Unit Acreage: 40, Drill Unit: NWNE
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-36 , Unit Acreage: 40, Drill Unit: MWME

Wellbore Completed
Completion Date:8/6/2009
Spud Date:7/12/2009Spud Date Is:ACTUAL
Measured TD:6197 ft.Measured PB depth:6130 ft.
True Vertical TD:6162 ft.True Vertical PB depth:6095 ft.
Top PZ Location:Sec:35 Twp: 7S 96WFootage: 824 FNL  2010 FEL
Bottom Hole Location:Sec:35 Twp: 7S 96WFootage: 824 FNL  2010 FEL
Log Types:CBL/CNL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 90, Top: 0 ft., Bottom: 80 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 818 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 226, Top: 0 ft., Bottom: 818 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6187 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 728, Top: 2524 ft., Bottom: 6187 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK2641 ft.NN
CAMEO5044 ft.NN
ROLLINS5440 ft.NN
COZZETTE5699 ft.NN
CORCORAN5938 ft.NN
MANCOS6029 ft.NN

Formation CRCRN                   Formation Classification:  DSPW                   Status:  SI - 12/1/2017                 Interval Top: 5982 ft.    Interval Bottom: 6012 ft.

 Completed Information for Formation CORCORAN
1st Production Date:N/AChoke Size: 
Formation Name:CORCORANCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Date:9/13/2009
Treatment Summary:FRAC 744 GAL OF 7.5% HCL; 87,566 GAL OF 2% KCL; 440 SKS OF OTTAWA PROPPANT; 160 SKS OF PRIME PLUS PROPPANT.
Tubing Size:2.375 in.Tubing Setting Depth:5625 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CRCRN.
Perforation Data:
Interval Top:5982 ft.# Of Holes:30
Interval Bottom:6012 ft.Hole Size:0.34 in.

Formation COZZ                     Formation Classification:  DSPW                     Status:  SI - 9/16/2010                 Interval Top: 5728 ft.    Interval Bottom: 5770 ft.

 Completed Information for Formation COZZETTE
1st Production Date:N/AChoke Size: 
Formation Name:COZZETTECommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Date:12/21/2009
Treatment Summary:FRAC 744 GAL OF 7.5% HCL; 112,938GAL OF 2% KCL; 725 SKS OF OTTAWA PROPPANT; 175 SKS OF PRIME PLUS PROPPANT.
Tubing Size:2.375 in.Tubing Setting Depth:5625 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation COZZ.
Perforation Data:
Interval Top:5728 ft.# Of Holes:30
Interval Bottom:5770 ft.Hole Size:0.34 in.

Formation CZ-CR                   Formation Classification:  DSPW                   Status:  CM - 9/16/2010                 Interval Top: 5728 ft.    Interval Bottom: 6012 ft.

 Completed Information for Formation COZZETTE-CORCORAN
1st Production Date:N/AChoke Size: 
Formation Name:COZZETTE-CORCORANCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Date:8/6/2009
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:5625 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CZ-CR.
Perforation Data:
Interval Top:5728 ft.# Of Holes:60
Interval Bottom:6012 ft.Hole Size:0.34 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2027
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
12/01/2017
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i Y

 Tribal Well  i No