| Engineer | Form: (04) 401928920 07/15/2019 | This approval is good for one year and a new application must be made before February 4, 2020 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
|
| Engineer | Form: (04) 402308590 10/26/2020 | 1) This approval is good for one year and a new application must be made before 02/11/2021 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
3) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
|
| Engineer | Form: (04) 402590893 03/10/2021 | 1) This approval is good for one year and a new application must be made before 2/10/2022 (1 year from prior application).
Updates for the planned utilization of the well should be included with the application. Update information on construction, drilling, and completions on the pad as noted in operator comments.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
|
| Engineer | Form: (04) 402938046 02/09/2022 | 1) This approval is good for one year and a new application must be made before 12/18/2022 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. Please correct production reporting for 12/2018
3) Submit a current Wellbore Diagram on a Form 4 Sundry
|