Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15032
Well Classification: GW Status: PR - 8/1/2024
Well Name/No:SGU #CP11D-27 L27 49
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC-68711
Facility Status:PRStatus Date8/1/2024
FacilityID:293528LocationID:335939
County:GARFIELD #045Location:NWSW 27 4S96W 6
Field:GRAND VALLEY - #31290Elevation:8109 ft.
Basin:PICEANCE BASIN  
Planned Location:2058FSL  1222 FWLLat/Long: 39.671714 / -108.159792Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.671713 / -108.159793Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/1/2024             Measured TD: 11576 ft.    Vertical TD: 11436 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/1/2024
Wellbore PermitDIRECTIONAL
Permit #:20075193 Expiration Date:11/14/2008
Proposed Top PZ Location:Sec:27 Twp: 4S 96W Footage: 1662 FSL  2359 FWL
Bottom Hole Location:Sec:27 Twp: 4S 96W Footage: 1662 FSL  2359 FWL
Proposed Depth/Form:12654 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit:STORY GULCH UNI Unit Number:COC-69333X
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:8/5/2008
Spud Date:6/27/2008Spud Date Is:ACTUAL
Measured TD:11576 ft.Measured PB depth:11500 ft.
True Vertical TD:11436 ft.True Vertical PB depth:11360 ft.
Top PZ Location:Sec:27 Twp: 4S 96WFootage: 1662 FSL  2359 FWL
Bottom Hole Location:Sec:27 Twp: 4S 96WFootage: 1662 FSL  2359 FWL
Log Types:CBL (W/G.R., VDL) -- 2; MUD; G.R. - CCL -- TEMP
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: 0 ft., Depth: 99 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 140, Top: 0 ft., Bottom: 99 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2404 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1368, Top: 0 ft., Bottom: 2404 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5414 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 7667, Top: 0 ft., Bottom: 7667 ft., Determination Method: CALC
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.25 in., Size: 4.5 in., Top: 0 ft., Depth: 11576 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 347, Top: 6690 ft., Bottom: 11576 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH5883 ft.NN
OHIO CREEK7145 ft.NN
WILLIAMS FORK7578 ft.NN
CAMEO10926 ft.NN
ROLLINS11576 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 8/1/2024                  Interval Top: 8341 ft.    Interval Bottom: 11364 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORKCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:10/18/2013Treatment End Date:N/A
Treatment Summary:CIBP SET @ 8333' W/ 2 SX SAND, WHICH COVERS THE WILLIAMS FORK PERFS @ 8341'- 11364'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:10/1/2008
Treatment Summary:FRACTURED WITH: 71793 BBLS SLICK WATER, 263165 LBS 100 MESH, 193639 LBS 40/80 HYDROPROP, 1104680 LBS 20/40 JORDAN UNIMIN
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1329
BBLS_OIL 0
BTU_GAS 1090
CALC_BBLS_H2O 1329
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 700
CASING_PRESS 3850
MCF_GAS 700
TUBING_PRESS 1775
Perforation Data:
Interval Top:8341 ft.# Of Holes:267
Interval Bottom:11364 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)74
Total Gas Produced (MCF)39639
GOR535662
GOR DeterminationMCFE
Average BOE per Day18.902
Average MCFE per Day109.625

 Federal Financial Assurance  i Y

 Tribal Well  i No