| Engineer | Form: (04) 400731843 11/19/2014 | 1) Perform a mechanical integrity test and submit on a Form 21 prior to stimulating the well. Pressure test 7" first string casing to expected highest fracture pressure before initiating stimulation. |
| Engineer | Form: (04) 402099403 05/27/2020 | 1) This approval is good for one year and a new application must be made before 7/08/2020 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
3) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
|
| Engineer | Form: (04) 402309545 10/19/2020 | 1) This approval is good for one year and a new application must be made before 02/11/2021 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
3) A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
|
| Engineer | Form: (04) 402651964 04/08/2021 | 1) This approval is good for one year and a new application must be made before 2/11/2022 (1 year from prior application). Updates for the planned utilization of the well should be included with the application.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
|
| Engineer | Form: (04) 402991129 04/13/2022 | 1) Effective Apr 30, 2022 this well will be designated inactive and must be properly returned to production, plugged, have an approved 5B or added to a Form 6A list no later than November 1, 2022.
2) The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request. |
| OGLA | Form: (06) 403743047 04/12/2024 | This oil and gas location is within CPW-mapped Greater Sage-Grouse Priority Habitat Management Area (PHMA). CPW recommends that disturbance activities occur outside the period from March 1 to July 15 to protect the lekking, nesting, and brood-rearing periods for greater sage-grouse.
Email correspondence with CPW and Operator confirms work will take place after July15, 2024 at this location.
|
| Engineer | Form: (06) 403743047 05/13/2024 | 1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations and electronic Form 42 Notice of Plugging Operations 48 hours prior to mobilizing for plugging operations. These are two separate notifications, required by Rules 405.e and 405.l.
2) The approved Form 6, Notice of Intent will be at the location during all phases of plugging operations.
3) Operator shall implement measures to control venting and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard.
4) Prior to placing surface shoe plug verify that all fluid (liquid and gas) migration has been eliminated. If evidence of fluid migration or pressure remains, contact ECMC Engineer for an update to plugging orders.
5) If applicable properly abandon flowlines as per Rule 1105. Pursuant to Rule 911.a. Closure of Oil and Gas Facilities, Operator will submit Site Investigation and Remediation Work plans via Form 27 for ECMC prior approval before cutting and capping the plugged well, conducting flowline abandonment, and removing production equipment. Pursuant to Rule 1105.f. Abandonment Verification, within 90 days of an operator completing abandonment requirements for a flowline or crude oil transfer line, an operator must submit a Field Operations Notice, Form 42-Abandonment of Flowlines for on-location flowlines, and a Flowline Report, Form 44, for off-location flowlines or crude oil transfer lines.
6) Prior to starting plugging operations a bradenhead test shall be performed if there has not been a reported bradenhead test within the 60 days immediately preceding the start of plugging operations.
If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required.
If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required.
The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the ECMC within three (3) months of collecting the samples.
7) With the Form 6 SRA operator must provide written documentation, which positively affirms each COA listed above has been addressed.
8) This well has federal minerals. Operator shall notify ECMC engineering staff of any plugging changes required by the BLM or unexpected conditions in the field as soon as feasible. Primary contact is Aaron Katz at 970-765-6300. Alternate ECMC contact is Byron Gale at 970-319-4194.
|