| Engineer | Form: (02) 401209239 03/08/2017 | Cement Bond Log will be run on both the 7" casing and the 4-1/2" casing if set. |
| Engineer | Form: (02) 401209239 03/08/2017 | Bradenhead tests shall be performed and reported according to the following schedule and Form 17 submitted within 10 days of each test.:
1) Within 60 days of rig release, prior to stimulation.
2) 6 months after rig release, prior to stimulation.
3) Within 30 days of first production, as reported on Form 5A.
|
| Engineer | Form: (02) 401209239 03/08/2017 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU for the first well activity with a rig on the pad.
2) Comply with Rule 317.i. and provide cement coverage from end of 7" casing to a minimum of 200' above Niobrara and from TD of 4-1/2" casing to 100' into the 7" casing shoe. Verify coverage with cement bond log.
|