Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-039-06682
Well Classification: OW Status: PR - 12/1/2025
Well Name/No:Vermillion #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KTM OPERATING LLC - 10722
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2025
FacilityID:449575LocationID:449576
County:ELBERT #039Location:SWNE 2 13S58W 6
Field:WILDCAT - #99999Elevation:5693 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1369FNL  1527 FELLat/Long: 38.950150 / -103.855030Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 38.950150 / -103.855030Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/24/2017
End Date: 8/24/2017
Reported: 9/21/2017
Days to report: 28
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2025             Measured TD: 9335 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2025
Wellbore Permit
Permit #: Expiration Date:3/8/2019
Proposed Depth/Form:9600 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: ATOK , Formation: ATOKA , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: CHRK , Formation: CHEROKEE , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: MRRW , Formation: MORROW , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: SPGN , Formation: SPERGEN , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 279, Top: 0 ft., Bottom: 500 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5500 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 237, Top: 3500 ft., Bottom: 5500 ft.
Casing:String Type: 2ND, Hole Size: 6.25 in., Size: 4.5 in., Top: 0 ft., Depth: 9600 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 407, Top: 4500 ft., Bottom: 9600 ft.

Wellbore Completed
Completion Date:4/15/2017
Spud Date:3/15/2017Spud Date Is:ACTUAL
Measured TD:9335 ft.Measured PB depth:9012 ft.
True Vertical TD:True Vertical PB depth:
Log Types:Schlumberger Quad Combo Log - 2.71; PEX-BHC-AIT-BHC-AIT-BHC-CNL-TLD-GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 500 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 0 ft., Bottom: 500 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 9061 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 390, Top: 7263 ft., Bottom: 9061 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 3437 ft., Depth: 5358 ft., Bottom: 5363 ft., Sacks: 460, Method: DV TOOL
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS3525 ft.3745 ft.
NIOBRARA-FT HAYS3745 ft.4291 ft.
CODELL4291 ft.4698 ft.
D & J SAND4698 ft.4888 ft.
LAKOTA-DAKOTA-MUDDY4888 ft.5068 ft.
MORRISON5068 ft.5225 ft.
ENTRADA5225 ft.5447 ft.
LYKINS5447 ft.5749 ft.
LYKINS5447 ft.5749 ft.
PERMIAN5749 ft.5897 ft.
BLAINE5897 ft.5957 ft.
LYONS5957 ft.6486 ft.
PENNSYLVANIAN6486 ft.6717 ft.
SHAWNEE6717 ft.7213 ft.
DOUGLAS CREEK7213 ft.7454 ft.
HEEBNER7454 ft.7473 ft.
LANSING-MARMATON7473 ft.8036 ft.
CHEROKEE8036 ft.8355 ft.
ATOKA8355 ft.8986 ft.
MORROW8986 ft.9199 ft.
MISSISSIPPIAN-OSAGE9199 ft.

Formation ATOK                     Formation Classification:  OW                     Status:  AB - 2/1/2018                  Interval Top: 8641 ft.    Interval Bottom: 8838 ft.

 Completed Information for Formation ATOKA
1st Production Date:5/22/2017Choke Size: 
Formation Name:ATOKACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/24/2017Treatment End Date:8/24/2017
Treatment Summary:Attachement documents (Attachments Tab) and additonal explanations (Submit tab) in these tabs for more complete explanation. Well tested 2 different sets of Atoka Perfs. Bottom zones were acidized and later a failed frac attempt (screened out). A CIBP w/2sx of cement set for temporary isolation. The upper zones were acidized and later successfully frac'd down casing. Well is being set on pump to recover remainder of frac water and then evaluate for economic potential.
Total fluid used in treatment (bbls):2916Max pressure during treatment (psi):6000
Total gas used in treatment (mcf):Fluid density (lbs/gal):9.10
Type Of gas:Number Of staged intervals:15
Total acid used in treatment (bbls):112Min frac gradient (psi/ft):0.70
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):248
Fresh water used in treatment (bbls):2804Disposition method For flowback:DISPOSAL
Total proppant used (lbs):57500Green completions techniques utilized:--
Reason green techniques Not utilized: PIPELINE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/30/2018Test Method:Production
Hours Tested:24Gas Type:WET
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 15
BBLS_OIL 11
BTU_GAS 1350
CALC_BBLS_H2O 15
CALC_BBLS_OIL 11
CALC_GOR 5136
CALC_MCF_GAS 56
GRAVITY_OIL 41
MCF_GAS 56
TUBING_PRESS 110
Perforation Data:
Interval Top:8641 ft.# Of Holes:136
Interval Bottom:8838 ft.Hole Size:0.52 in.

Formation CHRK                     Formation Classification:  OW                     Status:  PR - 12/1/2025                 Interval Top: 8043 ft.    Interval Bottom: 8147 ft.

 Completed Information for Formation CHEROKEE
1st Production Date:2/7/2018Choke Size: 
Formation Name:CHEROKEECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:6/7/2022Treatment End Date:N/A
Treatment Summary:This well did not undergo any treatment type. There was no flowback. No proppant was used. Perforations were added to the existing formation (8043'-8049'); no other work was performed.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/6/2018Treatment End Date:2/6/2018
Treatment Summary:Frac with 1000 gals 15% HCL; 78,575 Gals Delta Frac (Howco) 140-20# fluid; 4,492 lbs 100 mesh Sand, 100,989 lbs 20-40 Sand. BDD 2275 at 38.8 BPM. Avg Pressure; 1751 psi, 43.9 BPM. ISIP 1746, 10 min 961 psi, 15 min 839 psi.
Total fluid used in treatment (bbls):1895Max pressure during treatment (psi):2275
Total gas used in treatment (mcf):Fluid density (lbs/gal):9.10
Type Of gas:Number Of staged intervals:12
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):0.65
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):214
Fresh water used in treatment (bbls):1871Disposition method For flowback:DISPOSAL
Total proppant used (lbs):891009Green completions techniques utilized:--
Reason green techniques Not utilized: PIPELINE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 58
BBLS_OIL 10
BTU_GAS 1304
CALC_BBLS_H2O 58
CALC_BBLS_OIL 10
CALC_GOR 2200
CALC_MCF_GAS 22
GRAVITY_OIL 35
MCF_GAS 22
TUBING_PRESS 35
Perforation Data:
Interval Top:8043 ft.# Of Holes:144
Interval Bottom:8147 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)910
Total Gas Produced (MCF)0
GOR
GOR DeterminationBOE
Average BOE per Day2.511
Average MCFE per Day14.566

 Federal Financial Assurance  i 

 Tribal Well  i No