Drilling/Completion Operations | Form: (02 ) 402191626 3/13/2020 | Surface casing setting depth planned a minimum of 200' below the base of the Fox Hills formation.
|
Drilling/Completion Operations | Form: (02 ) 402191626 3/13/2020 | Alternative Logging Program- One of the first wells drilled on the pad will be logged with Open-hole Resistivity Log and Gamma Ray Log will be run from the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of the wellbore will be logged with a measured-while-drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs shall clearly state "Alternative Logging Program- No open-hole logs were run" and shall clearly identify (by API#, well name & number) the well in which open-hole logs were run.
|
Drilling/Completion Operations | Form: (02 ) 402191626 3/13/2020 | If a skid is performed for the subject well, then the only required BOPE tests will be for any broken BOPE connections, as long as a full BOPE test was performed at the beginning of the pad, and as long as all necessary BOPE tests are completed at least every 21 days during the pad operations.
|
Drilling/Completion Operations | Form: (02 ) 402905008 3/8/2022 | Alternative Logging Program: One of the first wells drilled on the pad will be logged with open-hole resistivity log and gamma-ray log from the kick-off point into the surface casing. All wells on the pad will have a cement bond log with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The horizontal portion of every well will be logged with a measured-while drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs shall state “Alternative Logging Program - No open-hole logs were run” and shall clearly identify the type of log and the well (by API#) in which open-hole logs were run. |
Drilling/Completion Operations | Form: (02 ) 402905008 3/8/2022 | Anti-collision: Operator will perform an anti-collision evaluation of all active (producing, shut in, or temporarily abandoned) offset wellbores that have the potential of being within 150 feet of a proposed well prior to drilling operations for the proposed well. Notice shall be given to all offset operators prior to drilling. |
Drilling/Completion Operations | Form: (02 ) 403019262 4/22/2022 | Alternative Logging Program: One of the first wells drilled on the pad will be logged
with open-hole resistivity log and gamma-ray log from the kick-off point into the surface
casing. All wells on the pad will have a cement bond log with gamma-ray run on
production casing (or on intermediate casing if production liner is run) into the surface
casing. The horizontal portion of every well will be logged with a measured-while
drilling gamma-ray log. The Form 5, Completion Report, for each well on the pad will
list all logs run and have those logs attached. The Form 5 for a well without open-hole
logs shall state ³Alternative Logging Program - No open-hole logs were run´and shall
clearly identify the type of log and the well (by API#) in which open-hole logs were run. |
Drilling/Completion Operations | Form: (02 ) 403019262 4/22/2022 | Anti-collision: Operator will perform an anti-collision evaluation of all active (producing,
shut in, or temporarily abandoned) offset wellbores that have the potential of being
within 150 feet of a proposed well prior to drilling operations for the proposed well.
Notice shall be given to all offset operators prior to drilling. |