Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-005-07469
Well Classification: OW Status: PR - 4/28/2023
Well Name/No:GRANDE 4-65 20-19 #2CH
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/28/2023
FacilityID:473321LocationID:472938
Municipality/County:AURORA / ARAPAHOE #005Location:NWNW 21 4S65W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:5661 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:905FNL  804 FWLLat/Long: 39.694070 / -104.675559Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.694059 / -104.675551Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #01
Start Date: 12/19/2022
End Date: 1/28/2023
Reported: 2/16/2023
Days to report: 19
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: DG - 11/18/2021             Measured TD: 6395 ft.    Vertical TD: 6263 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        DG - 11/18/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/7/2025
Proposed Top PZ Location:Sec:20 Twp: 4S 65W Footage: 2190 FNL  460 FEL
Bottom Hole Location:Sec:24 Twp: 4S 66W Footage: 2190 FNL  460 FWL
Proposed Depth/Form:23434 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-1367 , Unit Acreage: 5200, Drill Unit: T4S R65W Secs. 17-20
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 42.09 , Citings Type: PLANNED
Cement:Sacks: 114, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2288 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 1161, Top: 0 ft., Bottom: 2288 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 23434 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 3596, Top: , Bottom: 23434 ft.

Wellbore Completed
Completion Date:4/19/2022
Spud Date:9/19/2021Spud Date Is:ACTUAL
Measured TD:6395 ft.Measured PB depth:5556 ft.
True Vertical TD:6263 ft.True Vertical PB depth:5475 ft.
Bottom Hole Location:Sec:21 Twp: 4S 65WFootage: 1831 FNL  238 FWL
Log Types:MWD/LWD, (Triple Combination on 005-07471).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 105 ft., Weight: 42.09 , Citings Type: ACTUAL
Cement:Sacks: 6, Top: 0 ft., Bottom: 105 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2301 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 1161, Top: 0 ft., Bottom: 2301 ft., Determination Method: VISU
Casing:String Type: OPEN HOLE, Hole Size: 8.5 in., Size: , Top: 2301 ft., Depth: 6395 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
Additional Cement:String Type: OPEN HOLE , Top: 5556 ft., Depth: , Bottom: 6290 ft., Sacks: 298, Method:
FormationInterval TopLog BottomCoredDSTs
SUSSEX5422 ft.
SHANNON6320 ft.
  No formation data to display.

Sidetrack #01             Wellbore Classification: OW             Status: PR - 4/28/2023             Measured TD: 23514 ft.    Vertical TD: 8144 ft.

 Wellbore Data for Sidetrack #01Wellbore Classification: OW        PR - 4/28/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/21/2025
Proposed Top PZ Location:Sec:20 Twp: 4S 65W Footage: 2190 FNL  460 FEL
Bottom Hole Location:Sec:24 Twp: 4S 66W Footage: 2190 FNL  460 FWL
Proposed Depth/Form:23434 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-1367 , Unit Acreage: 5200, Drill Unit: T4S R65W Secs. 17-20
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42.09 , Citings Type: PLANNED
Cement:Sacks: 162, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2285 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 1161, Top: 0 ft., Bottom: 2285 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 23434 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 3596, Top: , Bottom: 23434 ft.

Wellbore Completed
Completion Date:4/25/2022
Spud Date:9/19/2021Spud Date Is:ACTUAL
Measured TD:23514 ft.Measured PB depth:23477 ft.
True Vertical TD:8144 ft.True Vertical PB depth:8144 ft.
Top PZ Location:Sec:20 Twp: 4S 65WFootage: 2197 FNL  470 FEL
Bottom Hole Location:Sec:24 Twp: 4S 66WFootage: 2209 FNL  436 FWL
Log Types:CBL, MWD/LWD, (Triple Combination on 005-07471).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 105 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 115, Top: 0 ft., Bottom: 105 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2301 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1161, Top: 0 ft., Bottom: 2301 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 23477 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3725, Top: 0 ft., Bottom: 23477 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4157 ft.NN
SUSSEX5473 ft.NN
SHANNON6296 ft.NN
SHARON SPRINGS7922 ft.NN
NIOBRARA7997 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 4/1/2023                  Interval Top: 8506 ft.    Interval Bottom: 23430 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/23/2023Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:12/19/2022Treatment End Date:1/28/2023
Treatment Summary:Frac'd Niobrara with 84 stage plug and perf; 17181038 total pounds proppant pumped: 15722202 pounds 40/70 mesh and 1458836 pounds 100 mesh; 742039 total bbls fluid pumped: 691810 bbls gelled fluid, 44086 bbls fresh water and 6143 bbls 15% HCl acid.
Total fluid used in treatment (bbls):742039Max pressure during treatment (psi):8822
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:84
Total acid used in treatment (bbls):6143Min frac gradient (psi/ft):0.86
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):44086Disposition method For flowback:DISPOSAL
Total proppant used (lbs):17181038Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8123 ft.
Tubing Packer Depth:8120 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/1/2023Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1508
BBLS_OIL 549
BTU_GAS 1300
CALC_BBLS_H2O 1508
CALC_BBLS_OIL 549
CALC_GOR 982
CALC_MCF_GAS 539
CASING_PRESS 1691
GRAVITY_OIL 42
MCF_GAS 539
TUBING_PRESS 2038
Perforation Data:
Interval Top:8506 ft.# Of Holes:3696
Interval Bottom:23430 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)52821
Total Gas Produced (MCF)203740
GOR3857
GOR DeterminationBOE
Average BOE per Day241.256
Average MCFE per Day1399.262

 Federal Financial Assurance  i 

 Tribal Well  i No