COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
401600166
05/14/2018
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU for the first well activity with a rig on the pad and provide 48 hour spud notice via Form 42 for all subsequent wells drilled on the pad. 2) Comply with Rule 317.j. and provide cement coverage from TD to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
EngineerForm: (02)
401600166
05/14/2018
Bradenhead tests shall be performed and reported according to the following schedule and Form 17 submitted within 10 days of each test: 1) Within 60 days of rig release, prior to stimulation. If any pressure greater than 200 psi, must contact COGCC engineer prior to stimulation. 2) 6 months after rig release, prior to stimulation (delayed completions). 3) Within 30 days of first production, as reported on Form 5A.
EngineerForm: (04)
402636502
03/24/2021
If well is not producing by December 8, 2022, an official MIT will need to be done.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Drilling/Completion OperationsForm: (02 )
401600166
5/16/2018
Anti-Collision: Renegade will perform an anti-collision evaluation of all active (producing, shut in, or temporarily abandoned) offset wellbores that have the potential of being within 150 feet of a proposed well prior to drilling operations for the proposed well. Notice will be given to all offset operators within 150 feet prior to drilling.
Drilling/Completion OperationsForm: (02 )
401600166
5/16/2018
Renegade will run at minimum an Open-hole Resistivity Log with Gamma Ray Log from TD to the surface casing of this vertical wellbore. This will verify the setting depth of the surface casing and any aquifer coverage. A Cement Bond Log with Gamma-Ray will be run on production casing from TD to 300' above top of cement. The Form 5, Completion Report, will list all logs run and have those logs attached.